Overview
In this chapter |
This chapter contains the following topics:
|
1. Purpose
Introduction |
|
This topic contains general principles of SOAR purpose, including
|
Change Date |
|
February 18, 2025
|
5.1.a. SOAR Definition |
|
A Strategic Oversight and Analysis Review (SOAR) is a formal review of an organizational element or an operational function of the Veterans Service Center (VSC), Benefits Eligibility Support Team (BEST), Disability Rating Activity Site (DRAS), Fiduciary Contact Center (FCC), Fiduciary Hub (hub), and Pension Management Center (PMC). SOARs are a self-audit technique to be used as a positive guide for operational analysis and improvement.
|
5.1.b. Purpose of a SOAR |
|
A researched and well-written SOAR is a valuable management tool for reviewing operations to identify existing or potential problems and propose corrective actions, as well as identify best practices that may be applied to other areas.
|
5.1.c. Primary Objectives of SOARs |
|
The primary objectives of a SOAR are to:
|
2. Responsibility, Schedule, and Control
Introduction |
Change Date |
|
February 18, 2025
|
5.2.a. Management Responsibility |
|
The Veterans Service Center Manager (VSCM), Disability Rating Activity Site Manager (DRASM), Special Mission Program Officer (SMPO), Fiduciary Contact Center Manger (FCCM), Fiduciary Hub Manager (FHM), Pension Management Center Manager (PMCM), and Benefits Eligibility Support Team Manager (BESTM) are responsible for the ongoing analysis of division operations, to include SOARs required by this chapter, as well as those required by Regional Office (RO) policy.
Responsibilities include
References: For more information on
|
5.2.b. Who May Complete SOARs |
|
Completing SOARs is not limited to supervisory personnel. VSCMs, DRASMs, SMPOs, FCCMs, FHMs, PMCMs, and BESTMs may assign SOARs to any personnel who are sufficiently experienced in division operations and who display analytical ability.
Consulting with subject matter experts and all levels of management during the SOAR planning, data gathering, and analysis portions is crucial to a successful result.
|
5.2.c. Frequency of SOARs |
|
Each SOAR will be completed biannually or annually, during the designated SOAR windows.
Note: The short time frame in between the two biannual windows allows for consistent and timely data collection. Additionally, efficacy of recommendations can be gauged and adjusted as necessary, to ensure improved compliance on a timely basis.
Example: The VSC/DRAS SOAR for Priority and Specialty Claims Processing will be submitted and concurred once during the December to February window and once during the June to August window.
The VSC/DRAS SOAR for Local Quality of Rating Veterans Service Representative (RVSR) Work will be submitted and concurred during the June to August window.
|
5.2.d. Schedule of SOARs |
The VSCM/DRASM/SMPO/FCCM/FHM/PMCM/BESTM is responsible for preparing the SOAR schedule annually prior to the start of the fiscal year (FY). Schedules must align with the frequency requirement set forth in this chapter and must include:
|
5.2.e. Necessity for More Frequent Analysis and/or Data Collection |
SOARs will be conducted on a schedule that, at a minimum, meets the requirements established in this chapter. However, analysis and data collection may be necessary more frequently than scheduled to determine trends, obtain facts for special reports, or determine quality in specified areas.
It may be necessary to analyze only a segment of an area of review more frequently than scheduled.
Example: If local quality reviews and findings were determined to be a problem, then this topic would be analyzed more frequently, assessing the effectiveness of recommendations until the situation is resolved. All findings must be retained and discussed in the next regularly scheduled SOAR on the topic.
|
5.2.f. Extension Requests |
Extension requests must be documented, submitted to, and approved by the VSCM/DRASM/SMPO/FCCM/FHM/PMCM/BESTM prior to the scheduled due date. Extensions may be granted only within the current SOAR scheduling window.
Note: Extension approvals must be documented on the schedule and indicate the new approved due date.
Example: The SOAR scheduled due date is December 31. Coach submits a request for extension to the VSCM with reason for extension request on December 1. An extension may be granted by the VSCM within the current scheduling window to no later than February 28.
|
5.2.g. Control Log for Recommendations |
A control log for the completion of SOAR recommendations is required.
This log must include the following:
Control logs will be maintained for review as part of the associated SOAR for historical purposes. Documentation of the actions taken on the log with actual completion dates will help in monitoring compliance. This documentation is part of the originating SOAR, and must be discussed as part of the next scheduled SOAR.
Reference: For more information on the SOAR schedule, see M21-4, Chapter 5, Topic 2.d.
|
3. Format
Introduction |
This topic contains a description of the required format for SOAR, including
|
Change Date |
|
February 18, 2025
|
5.3.a. SOAR Format |
The format discussed in this section is required to ensure all topics, details, and analysis are contained in the SOAR.
Reference: For an example of the required SOAR format, see M21-4, Chapter 5, Appendix A.
|
5.3.b. Date and Title |
|
The date of completion of the SOAR must be included and the title will reflect the required SOAR topic reviewed. References: Form more information on SOAR topic requirements for
|
5.3.c. Scope of Review |
|
The scope of review will include, at a minimum, a brief overview of the main topics covered, time period covered and date of review.
Note: Operational parameters should be explained, to provide context and clarity, if applicable (for example, changes during the review period, a pilot project that took place for three months out of the six-month review period, etc.).
|
5.3.d. Review of Previous Recommendations |
|
Recommendations from the last SOAR report must be restated and include actions taken to implement the previous recommendations and the impact of those actions. The success of the implemented recommendations will be detailed in the findings and analysis sections.
If the previous recommendation was not implemented, an explanation of the mitigating circumstances will be included and/or the previous recommendation will be continued as a current recommendation in the next SOAR, if supported by the findings and analysis.
Reference: For more information on the control log for recommendations, see M21-4, Chapter 5, Topic 2.g.
|
5.3.e. Current Findings and Analysis |
|
The current findings and analysis section will contain a summarization of the data reviewed and in-depth analysis of the data presented.
All required topics and sub-topics must provide:
Important: Possible data and process review resources include (but not limited to): Tableau reports, Oracle Business Intelligence Enterprise Edition Reports, Workload and Time Reporting System, Quality Management System, M21-1 and M21-4 procedures, VBA policy or directives, and subject matter expert interviews, and must be cited appropriately in this section of the report.
|
5.3.f. Conclusion |
|
The conclusion of the SOAR will provide a discussion of any identified potential problem areas and/or best practices.
Important:
|
5.3.g. Recommended Action to Improve or Resolve Problematic Areas |
|
When areas of improvement are identified by a SOAR, the report must include recommended actions to remedy the problem. Recommendations must be justified by the findings and analysis, which will be supported by data.
The recommended actions must include the
Example: On the first of every month, the Management Analyst will review deferral data to determine whether a decrease in avoidable deferrals caused by VSC/BEST is shown. Success will be measured by a reduction of X% by next SOAR review period.
Reference: For more information on the control log for recommendations requirement, see M21-4, Chapter 5, Topic 2.g. |
5.3.h. Signature Requirements and Approval of SOARs |
SOARs must include the following signatures and approvals:
All concurrence signatures and dates will be captured and digitally saved to the electronic document and must be signed within the designated SOAR window.
|
4. VSC/DRAS SOAR Topic Requirements
Introduction |
This topic contains information on areas that must be covered in the VSC SOARs, including
|
Change Date |
|
June 6, 2025
|
|
5.4.a. Content of SOARs |
The review must cover all related factors outlined in each SOAR below.
Notes:
Important: Each analysis must identify any potential problem areas drawn from assumptions and predictions based on the findings and analysis. All assumptions and predictions must be explained and supported with rationale that is clearly outlined and supported by quantitative and/or qualitative data (for example, include sample reviews with results where applicable).
|
|
5.4.b. SOAR for Priority and Specialty Claims Processing
|
|
The biannual SOAR for Priority and Specialty Claims Processing must include analysis of
References: For more information on
|
5.4.c. SOAR for Local Quality of RVSR Work |
|
The annual SOAR for Local Quality of RVSR Work must include analysis of
References: For more information on
|
5.4.d. SOAR for Local Quality of VSR Work |
|
The annual SOAR for Local Quality of Veterans Service Representative (VSR) Work must include analysis of
References: For more information on
|
|
5.4.e. SOAR for Overdevelopment in Claims Processing
|
|
The biannual SOAR for Overdevelopment in Claims Processing must include analysis of
References: For more information on
|
5.4.f. SOAR for UVR |
The SOAR for Unclaimed Veteran Remains (UVR) must include an annual review and analysis of
The SOAR must also document that
Note: The IVURC POC for each RO is determined by the RO Executive Director or designee. This position is not limited to the VSC and may be an employee in the PMC or in the office of the RO Director. There also may be multiple IVURCs at an RO. Coordination of SOAR responsibility should be outlined when multiple IVURCs exist, to not duplicate efforts.
|
5.4.g. Public Contact and Outreach |
Public Contact and Outreach requirements can be found in the M27-4, Part I, Chapter 03.
|
5. BEST SOAR Topic Requirements
Introduction |
This topic contains information on areas that must be covered in the BEST SOARs including
|
Change Date |
October 26, 2023
|
5.5.a. Content of SOARs |
The review must cover all related factors outlined in each SOAR below.
Notes:
Important: Each analysis must identify any potential problem areas drawn from assumptions and predictions based on the findings and analysis. All assumptions and predictions must be explained and supported with rationale that is clearly outlined and supported by quantitative and/or qualitative data (i.e., include sample reviews with results where applicable).
|
5.5.b. SOAR for Local Quality of VSR Work |
The annual SOAR for Local Quality of VSR Work must include analysis of
References: For more information on
|
5.5.c. SOAR for Internal Controls |
The biannual SOAR for Internal Controls must include analysis of
References: For more information on
|
5.5.d. SOAR for Floater Review |
The biannual SOAR for Floater Review will include a review of the topic/sub-topics designated by the Business Line, or the division or RO leadership will self-designate the topic(s) for the floater review.
Suggested topics for special floater review include:
Note: The floater review must include all required report format elements.
Reference: For more information on review format, see M21-4, Chapter 5, Topic 3.
|
6. PMC SOAR Topic Requirements
Introduction |
This topic contains information on areas that must be covered in the PMC SOARs, including
|
Change Date |
June 6, 2025
|
5.6.a. Content of SOARs |
The review must cover all related factors outlined in each SOAR below.
Notes:
Important: Each analysis must identify any potential problem areas drawn from assumptions and predictions based on the findings and analysis. All assumptions and predictions must be explained and supported with rationale that is clearly outlined and supported by quantitative and/or qualitative data (i.e., include sample reviews with results where applicable).
|
5.6.b. PMC SOAR for Workload Assignment and Routing |
The annual SOAR for Workload Assignment and Routing must include analysis of
Effectiveness of workload assignment and routing for the aforementioned sub-topics should be measured by
PMCs should include an analysis of impacts to timeliness and effectiveness (e.g., training needs, external prioritization of workload, etc.) in order to identify proactive methods of workload management to reduce these effects.
Note: It is noted that there are no data sources available for the accuracy or manual routing of cases. Instead, PMCs are encouraged to review a sample of cases, broken out by applicable teams and roles, and to conduct interviews with personnel to determine effectiveness. PMCs should also review local routing rules for redundancies and incomplete or incorrect routing of workload.
Reference: For more information on creating VBMS routing rules, see the Workload Management Job Instruction Sheet.
|
5.6.c. PMC SOAR for Local Quality of Work |
The annual SOAR for Local Quality of Work must include analysis of
The SOAR for local quality of work should also include a sample review and analysis of
Reference: For more information on proper claims establishment and maintenance, see M21-4, Appendix B.
|
5.6.d. PMC SOAR for Deferrals |
The annual SOAR for Deferrals must include analysis of
Note: It is noted that there are no data sources available to measure timeliness of action. Instead, PMCs are encouraged to review a sample of cases, broken out by appropriate work types or teams, to determine average timeliness.
|
5.6.e. PMC SOAR for Erroneous Payments |
The biannual SOAR for Erroneous Payments must include analysis of
|
5.6.f. PMC SOAR for Special Emphasis Review |
P&F Service will provide the PMCs with the designated topic for the annual SOAR for Special Emphasis Review The goal for this review is to conduct a deep dive analysis of a specific subset of the PMCs’ workload. Upon completion, this report should be submitted to the P&F Service, Quality, and Oversight mailbox (VAVBAWAS/CO/P&F QUAL OVRST) for consideration.
The SOAR for the special emphasis review must include analysis of
Example: Topics which may be chosen by P&F Service for the special emphasis review SOAR include, but are not limited to
|
5.6.g. SOAR for UVR |
The SOAR for UVR must include an annual review and analysis of
The SOAR must also document that
Note: The IVURC POC for each RO is determined by the RO Executive Director or designee. This position is not limited to the PMC and may be an employee in the VSC or in the office of the RO Director. There also may be multiple IVURCs at an RO. Coordination of SOAR responsibility should be outlined when multiple IVURCs exist, to not duplicate efforts.
|
7. Hub SOAR Topic Requirements
Introduction |
This topic contains information on areas that must be covered in the hub SOARs, including |
Change Date |
February 18, 2025
|
5.7.a. Content of SOARs |
SOARs must be performed annually or biannually during the designated SOAR windows and must cover all related factors outlined in each SOAR below. Each SOAR must include a control log as described in M21-4, Chapter 5, Topic 2.
Notes:
Important: Each analysis must identify any problem and/or potential problem areas drawn from assumptions and predictions based on the facts and findings. All assumptions and predictions must be explained and supported with rationale that is clearly outlined and supported by quantitative and/or qualitative data (for example, include sample reviews with results where applicable).
|
5.7.b. SOAR for Field Examinations and Onsite Reviews |
The annual SOAR for Field Examinations and Onsite Reviews must include analyses of
All analyses must address each of the following areas:
Note: Hubs must review onsite reviews, broken out by scheduled and unscheduled, to determine average completion timeliness and resolution of outstanding items on the Onsite Review Correction Log.
|
5.7.c. SOAR for Financial Reviews |
The biannual SOAR for Financial Reviews, for Federal and court accountings and fund usage reviews, must include analyses of
|
5.7.d. SOAR for Misuse |
The annual SOAR for Misuse must include analyses of overall timeliness and accuracy of allegation through investigation. In addition, include a targeted outcome analysis of the following:
Note: If formal reporting/data is not available, the hub should review a sample of cases.
|
5.7.e. SOAR for Quality Review Teams |
The annual SOAR for Quality Review Teams must include analyses of
|
5.7.f. SOAR for Hub Administration |
The annual SOAR for Hub Administration must include analyses of WMP compliance, to include an analysis of the effectiveness of
|
5.7.g. SOAR for Administrative Tasks |
The SOAR for Administrative Tasks must include a biannual review and analyses of
Note: Hubs must review a sample of cases, broken out by administrative task title to measure average timeliness.
|
5.7.h. Hub SOAR for Special Emphasis Review |
P&F will provide the hubs with the designated topic for the annual special emphasis review, when necessary. The goal for this review is to conduct a deep dive analysis of a specific subset of the hub’s workload. Upon completion, this report should be submitted to the P&F Service, Quality, and Oversight mailbox (VAVBAWAS/CO/P&F QUAL OVRST) for consideration.
The SOAR for the Special Emphasis Review must include analysis of
Example: Topics which may be chosen by P&F for the special emphasis review SOAR include, but are not limited to
Reference: For more information on jurisdiction for issuing an appeal decision relating to a fiduciary appointment, see M21-5, Chapter 7, D.1.b.
|
8. FCC SOAR Topic Requirements
|
Introduction |
This topic contains information on areas that must be covered in the FCC SOARs, including
|
|
Change Date |
February 18, 2025 |
|
SOARs must be performed annually or biannually during the designated SOAR windows and must cover all related factors outlined in each SOAR below. Each SOAR must include a control log as described in M21-4, Chapter 5, Topic 2. Notes:
Important: Each analysis should identify any problem and/or potential problem areas drawn from assumptions and predictions based on the facts and findings. All assumptions and predictions should be explained and supported with rationale that is clearly outlined and supported by quantitative and/or qualitative data (for example, include sample reviews with results where applicable). |
|
The annual SOAR for FCC Contacts should include a review of
|
|
The annual SOAR for FCC administration must include a review of
|
|
P&F will provide the FCC with the designated topic for the annual special emphasis review, when necessary. The goal for this review is to conduct a deep dive analysis of a specific subset of the FCC's workload. Upon completion, this report should be submitted to the P&F Service Quality and Oversight mailbox (VAVBAWAS/CO/P&F QUAL OVRST) for consideration. The SOAR for the Special Emphasis Review must include analysis of
Example: Topics which may be chosen by P&F for the special emphasis review SOAR include, but are not limited to
|
9. Retention
Introduction |
This topic contains information on SOAR retention, including
|
Change Date |
|
January 13, 2022
|
5.9.a. SOAR Retention |
|
Retain a copy of the SOAR, the log of control for recommendations, and related working documents in an electronic folder specific to the topic.
|
5.9.b. Disposition of Reports and Material |
|
Dispose of these reports and related material in accordance with RCS VB-1 part I item number 13-098.000.
|
Appendix A. Required SOAR Format
Change Date |
|
January 13, 2022
|
5.A.a. Required SOAR Format |
|
The format below is the required SOAR format.
|