Skip to main content

Mirrored VA administrative guidance

Chapter 3. National Quality Reviews

Overview
 


In This Chapter

This chapter contains the following topics and appendices:
Topic
Topic Name
1
2
3
4
5
 
Reporting the Correction of National Error Citations      Reporting the Correction of National Error Citations
6
Appendix A
Appendix B

1.  Purpose 


Introduction

This topic describes the purpose of national quality reviews, including

Change Date

Janauary 14, 2026

3.1.a.  Methods to Determine and Improve Quality

 
Effective quality reviews and positive action to improve quality levels are required for all compensation claims.  Methods used to determine quality levels and improve quality on an organized technical basis vary and are described in the following subchapter.  The methods may consist of
  • regular supervision and training
  • mandatory or optional reviews and spot checks
  • controls of various kinds including cost controls or formal control procedures such as the Systematic Technical Accuracy Review (STAR) program, and
  • special focused quality improvement reviews.

3.1.b.  STAR

STAR is the Veterans Benefits Administration’s (VBA) national method for measuring compensation claims processing accuracy in the national quality review program.  STAR includes review of work in two areas
  • claims that usually require a rating decision, and
  • claims that generally do not require a rating decision.
Note:  STAR results are generated for all of VBA’s regional offices (ROs) and are included in the RO Director’s Performance Plan.

3.1.c.  Quality Review and the VSC/DRAS/BEST/MST OC

The quality review system is intended to assist managers in monitoring the level of service to claimants.  This system requires that quality observations and reviews be performed on a continuing basis in all areas of Veterans Service Center (VSC), Disability Rating Activity Site (DRAS), Benefit Eligibility Support Team (BEST) operations, and the Military Sexual Trauma - Operations Center (MST-OC).
Note:  The quality review system does not require that evaluations encompass every work team within the division.

2.  Quality Review Sampling 


Introduction

This topic describes the quality review sampling procedures, including

Change Date

June 5, 2025

3.2.a.  Selection Procedures

Each month, the Office of Performance Analysis and Integrity (PA&I) generates a list of end products (EPs) selected for national quality review for delivery to Quality Assurance (QA) via the Quality Management System (QMS).  These EPs are randomly sampled from those completed during the previous month.
The total monthly sample for each RO includes both rating and non-rating EPs, allowing assessment of all essential claim adjudication actions.

3.2.b.  Annual Sample Sizes

PA&I uses a statistical formula that considers both historical accuracy and workload values when determining valid rating and non-rating sample sizes for each RO.
QA provides annual sample size information on the QA STAR Reports intranet page.
Notes:
  • Annual sample sizes are determined based on an average of two fiscal years’ worth of accuracy and workload data and are not subject to real-time adjustment.
  • The annual sample is spread out over the course of the year so that there are enough EPs selected each month for every RO to have a statistically valid sample at the end of the year.
  • Questions regarding either how cases are selected or how the sample size is determined should be referred to PA&I through appropriate channels.

3.2.c.  Rating EP Review

Rating EPs are those associated with initial claims (including original claims, new claims, and claims for increase), reviews for hospitalization and routine future examinations, and supplemental claims. Rating reviews involve issues that are generally more complex and subject to greater scrutiny by stakeholders.  Review of a rating EP is not limited to rating actions, but rather assesses the accuracy of all adjudicative actions leading up to the completion of that EP, with a focus on the outcome.
Compensation rating EPs subject to national quality review are
  • 010 series - Original disability compensation, eight or more issues
  • 020 series excluding 029 – New or increased disability compensation
  • 040 series - Supplemental claim rating
  • 110 series - Original disability compensation, seven or less issues
  • 310 series excluding 314, and
  • 320 series – Reviews due to hospitalization, and
  • EP 335 – Blue Water Navy.

3.2.d.  Non-Rating EP Review

Non-rating EPs are those that require development, review, and administrative decision or award action, but generally not a rating decision.  However, if a rating decision is necessary to complete action on the EP, that decision will also be subject to review.
Compensation non-rating EPs subject to national quality review are
  • 040 series - Supplemental claim non-rating
  • 130 series - Disability and death dependency
  • 163, 164, 165 - Accrued claims
  • 290 series - Eligibility determinations, other, and  
  • 600 series - Pre-determination notice.

3.  Quality Review Structure 


Introduction

This topic describes the quality review structure, including

Change Date

January 14, 2026

3.3.a.  Quality Review Checklists

The STAR process requires a comprehensive review and analysis of all elements of processing associated with a specific claim or issue.  Quality review checklists are designed to facilitate consistent structured reviews.

3.3.b.  General Guidelines for BE Quality Reviews

The general guideline is to record a benefit entitlement (BE) error when an action taken violates current regulations or other directives and affects outcome, or has the potential to affect outcome.
 
Examples of outcome-related deficiencies include, but are not limited to
  • failing to adequately address all issues requiring a formal decision, or
  • errors that result in an overpayment or underpayment to a claimant, or
  • premature decisions that violate the claimant’s due process rights, fail in VA’s duty to assist, and/or otherwise lack necessary development actions that may impact the outcome of the claim.

3.3.c.  Grace Period for National Quality Errors

QA may provide a 30 calendar day grace period on any substantive manual changes before officially citing a national quality error.  The 30 calendar day grace period is counted as 30 calendar days from the date the corresponding Department of Veterans Affairs (VA) Key Changes document is published. Changes issued for language or other minor grammatical corrections are not considered substantive changes. Examples of substantive changes include, but are not limited to, new procedures being introduced or new rating criteria being effectuated.
STAR grace periods may not be of the same duration when an extended grace period is established for the local Individual Quality Review (IQR) program.
 
Example:  VA Key Changes document showing new manual guidance is published on October 4, 2023, so the grace period includes the next 30 calendar days.  BE errors based on the new guidance would be cited with cleared EPs on and after November 2, 2023.
Note:  Guidance issued through other means, such as interim guidance or guidance issued by the Office of Field of Operations (OFO) that contains specific claim processing instructions, does not warrant a grace period unless one is specifically provided by OFO or Compensation Service.

3.3.d.  Procedural Deficiencies

Procedural deficiencies generally do not rise to the level of BE errors.  These deficiencies are usually recorded as
  • decision documentation errors
  • notification errors
  • administrative (internal controls) errors
  • examination and medical opinion request-related errors
  • expedited favorable decision comments, and
  • non-BE comments when corrective action is needed.
Notes:
  • If an error requiring correction is identified with an issue not related to the EP under review, that error is also recorded as a comment.

3.3.e.  Deselections

With the goal of ensuring a statistically valid and representative sample, every effort will be made to perform a quality review on the cases selected for STAR, however, in instances where it would be inappropriate to perform a quality review on the EP selected, QA will deselect the review.
Generally speaking, for rating claims, QA will complete a review on all cases where it is clear that the RO has completed the claim and there is no remaining development outstanding. For example, if an EP is cleared prematurely when the final rating included directed development for one or more contentions, this would warrant deselection. As the RO personnel indicated that the claim required further development, it was not the intent of the RVSR to have the EP cleared and thus included in the RO's rating sample pool.
However, if the EP has been cleared and the final rating decision contains no directed development instructions, then the review would not warrant a deselection. In the absence of documented development needs, it is presumed that RO staff has found all actions that were taken or should have been taken to be complete. Clearing the EP will then include the claim as part of the RO's rating sample pool.

3.3.f.  Error Citations When Corrective Action Has Already Been Taken 

QA will not cite any errors in cases of EPs selected for STAR assessment where ROs have discovered the error(s), made proper correction(s), and cleared the correcting EP before the case was selected, regardless of whether not the claimant received incorrect notification.
 
However, if a correcting EP is established and still pending, or if the correcting EP was previously established but cleared with final corrective action on or after the  QMS “Run Date”(the date PA&I pulls the case in QMS for national quality review), QA will cite the error(s) made on the EP under STAR assessment.  Please note that the corrective action(s) taken will also be subject to STAR assessment.
Note: The QMS Run Date is the same date that the review record was created.
Example: A claim with a transaction date of January 15, 2024 is selected for STAR review. The run date shown in QMS is February 1, 2024. The RO identified an error on the claim on February 8, 2024, before QA finalized its STAR review on the claim. QA will still cite any error(s) on the EP as the the Run Date on the review record is before February 8, 2024.
If the RO had identified the error and completed corrective action on or before January 31, 2024, no errors would be cited against the RO.
Important: On Special Focused Reviews (SFRs), errors may still be cited even if corrected by the RO. SFRs may be used to collect point-in-time data for claims processing and have a longer look back period from which the sample is being selected from. As a result, an error may still be relevant for data collection purposes even if corrected by the RO prior to being selected for an SFR.

3.3.g.  Reviewing All Evidence Associated With a Claim

STAR Quality Reviewers must thoroughly review each issue in every case.  It is not sufficient to simply review a decision and the letter of notification.  All of the evidence associated with a claim must be reviewed to ensure that all issues (inferred as well as claimed) have been properly adjudicated. 

3.3.h.  Clearly Identifying and Explaining Errors

Sufficient narrative must be provided to clearly identify and explain the error cited.  In most cases the explanation for the error(s) found should be sufficient to allow a reader to understand the problem area(s) without reviewing the claims folder.  If the correct action was something other than the obvious converse of the erroneous action, then a statement indicating what the correct action would have been is required.  

3.3.i.  Appropriate Citations

Appropriate citation supporting an error call must be provided.  In most cases, the reference should cite the appropriate statute or regulation, but it may also cite a
  • manual provision
  • General Counsel (GC) precedent decision, or
  • Court of Appeals for Veterans Claims (CAVC) precedent decision.
Note:  VBA letters may also be referenced.

3.3.j.  Cascade Effect

Based on the logical progression of the review sheets, when an error is identified, generally all subsequent processing related to that issue will also be in error.  This pattern of derived error is referred to as a cascade effect.
Examples:
  • If an issue was not addressed, it is most likely that the issue was not developed, not rated, or notification for the issue was not sent.
  • If a claim was properly developed but not properly rated, then inherently, the notification would be incorrect.
Issue-based reviews focus on the accuracy of specific diagnostic codes (DCs) so the prohibition of cascading errors that exists for traditional claim-based reviews is modified for issue-based reviews. 
If the same error is committed across multiple DCs, each instance of the error will be cited when completing the issue-based review. This is not considered cascading as each DC is reviewed independently of the others. 
For issue-based reviews, we need more data regarding the complete decision for each DC.  An issue-based review  requires that we determine if a disability was adequately evaluated, even if it was erroneously granted.  This modification to the normal procedures will generally only apply to incorrect grants, as there will be no evaluation or effective date for an incorrect denial or missed issue, though incorrect evaluations could also have incorrect effective dates.
With a claim-based review, an incorrect grant would result in a C1 error, with no further consideration or errors concerning the evaluation or effective date of that erroneous grant.

4. Recording and Analysis of Review Results


Introduction

This topic describes procedures for recording and analysis of review results, including

Change Date

September 10, 2024

3.4.a.  Availability of Review Results

The results of national reviews are maintained in QMS. 
  • National Quality reports are published via the VBA Intranet in twelve-month rolling cumulative, three-month rolling cumulative, quarterly, and monthly formats for non-rating claim-based and rating issue-based errors.
  • Distribution of error reports are provided in twelve-month rolling cumulative as well as monthly and quarterly formats.
The national quality reports are updated monthly. Non-rating accuracy is reported on a claim-based level; rating accuracy is reported on an issue-based level.  In accordance with standard statistical practice, VBA reports weighted accuracy results.
Note:  RO performance ratings are generated during September using the most current available data.  For STAR reports, the most current data available in September will generally be the twelve-month cumulative report for the period from August of the prior fiscal year through July of the current fiscal year. This represents the STAR performance year.

3.4.b.  BE  Categories

BE review categories include
  • addressing all issues
  • duty to assist (38 CFR 3.159) and other applicable regulations for complete development
  • correct decisions
  • correct evaluations
  • correct effective dates, and
  • correct payment rates.
Note:  The BE accuracy rate is the official measure of claims processing accuracy.

3.4.c. Decision Documentation / Notification Categories

Decision documentation/notification categories include review of the decision and the notification sent to the claimant.
  

3.4.d. Issue and Claim Based Rating Reviews

Effective October 1, 2012, issue-based reviews are conducted in conjunction with the traditional compensation rating claim-based reviews.
An issue-based review and a claim-based review are conducted on every compensation rating claim submitted for national quality review.  

3.4.e. Task Based and Claim Based Non-Rating reviews

Effective July 1, 2017, task-based reviews are conducted in conjunction with the traditional compensation non-rating claim-based reviews.

A task-based review and a claim-based review are conducted on every compensation non-rating claim submitted for national quality review.


3.4.f.  Claim Based Accuracy

Claim-based reviews assess accuracy based on the entirety of the claim.  If one BE element of the claim is incorrect, the claim is marked as incorrect.  Claim-based accuracy is calculated as the percentage of cases considered correct out of the total number of cases reviewed.

3.4.g.  Issue
Based Accuracy

Issue-based accuracy is measured by individually evaluated medical contentions within a rating-related compensation claim.
Each issue must go through the same claims process that represents a series of completed tasks, such as development, research, adjudication, and decision, that could result in a specific benefit for a Veteran or survivor.  More importantly, issue-based accuracy provides VBA the opportunity to precisely target those specific issues where adjudication is most error-prone and additional training is needed.  ROs are provided with the total number of issues reviewed, and the total number of issues in error, on every issue-based review.
Note:  Issue-based accuracy is calculated as the percentage of issues considered correct based on the total number of issues reviewed for any review period.

5.  Reporting the Correction of National Error Citations 


Introduction

This topic describes procedures for reporting the correction of national error citations, including

Change Date

June 5, 2025

3.5.a.  Outcome of National Reviews

ROs will learn the outcome of a STAR assessment that results in an error via Quality Management System (QMS).
 
In QMS, the “Created Date” shown on the error correction record is the date the clearing RO was notified of the error in QMS. 

3.5.b.  Clearing RO vs. Correcting RO

The clearing RO is the RO that cleared the EP identified for national quality review.  In QMS the clearing RO is identified as the “Selected Station.” For reporting purposes, all errors and comments will be associated with the clearing RO.
 
The correcting RO is the RO that QA has identified as responsible for taking the corrective action(s) documented during the course of national quality review.  The correcting RO will be identified by its RO number at the beginning of each error correction narrative in QMS.  The correcting RO is responsible for all corrective actions on a claim, even for those errors caused by a different RO.  In all cases, only one RO will be identified to correct errors or comments cited on a review.
When determining the correcting RO, QA determines if the error occurred under the responsibility of the rating or clearing RO.
  • The rating RO is responsible for all actions leading up to and including the final rating decision associated with the EP under review.
  • The clearing RO, if different from the station completing the final rating, is responsible for any actions after the final rating, to include the award authorization of the EP under review.
Rating Reviews
If the error is… 
then…  
only a development- or rating-related BE error, OR in conjunction with any other errors (benefit entitlement, non-benefit entitlement, or error cited on other EP(s) not under STAR review), 
the rating RO is responsible.
only a promulgation/authorization-related BE error, OR in conjunction with any other promulgation/authorization error(s),
the clearing RO is responsible. 
only a non-benefit entitlement error(s),
the RO that committed the error, rating (to include development) or clearing RO, is responsible.
only a development or rating error(s) cited on another EP not under STAR review,
the rating RO for the EP that is under review is responsible.
only a promulgation/authorization error(s) cited on another EP not under STAR review,
the clearing RO for the EP that is under review is responsible.
Authorization Reviews
If the error is… 
then…  
identified on a rating decision (example EP 600s), OR in conjunction with any other error  
the rating RO is responsible.
related to an RBPS-processed EP under STAR review
QA will manually distribute errors to BEST divisions. 
on any non-rating activity NOT related to a rating decision or RBPS-processed EP  
the clearing RO is responsible 
Notes:
  •  If a deferred or partial rating is completed during the life of the claim, the RO that created the final rating will be identified as the rating RO when determining the correcting RO.
  • If no rating was prepared, corrections will be the responsibility of the clearing RO.
Example: A payment error based on incorrect Special Monthly Compensation (SMC) payment is cited on a rating review.
  • If the SMC coding was incorrect in the rating decision, then the rating RO is documented as the correcting RO.
  • If the SMC coding was correct in the rating, but the corresponding SMC payment rate is incorrect on the award, the clearing RO is identified as the correcting RO.

3.5.c.  Identified Responsible Employee

In most cases, QA will identify the employee responsible for the error.  Rating Veterans Service Representatives (RVSRs) are held responsible for both rating deficiencies and deficiencies in rating-related development.  Authorizers will be held responsible for award promulgation-related errors.
 
If multiple errors are cited on one case, QA will identify the RO responsible for executing all corrections in the error narrative(s).  For example, if the case has both rating and non-rating related errors, the rating RO is responsible for taking all corrective actions.
 
If the only corrective action required is not related to the EP identified for STAR assessment, no employee will be named.  Depending on the type of corrective action needed, QA will assign corrective action to either the clearing RO or rating RO that processed the EP under STAR assessment.  This error will not count against the RO’s accuracy; however, this RO is responsible for executing the corrective action(s).

3.5.d.  Action to Take Following Notification of a National Error

QMS will route the error correction record(s) to the clearing RO in all cases.  The national error correction record(s) will populate in the clearing RO’s QMS Coach Team queue.
 
The clearing RO’s Quality Review Team (QRT) Coach, or other appointed designee, will review the national error cited to determine if a reconsideration request will be submitted.
If …
Then he/she will follow the …
no reconsideration request is warranted
corrective action instructions in M21-4, 3.5.i.
a reconsideration request is warranted
reconsideration request instructions in M21-4, 3.6.

3.5.e.  EP 930 Establishment Requirements

An EP 930 must be established and cleared for any claim with a cited national error where the EP has been cleared or cancelled, even those that do not require a rating or award correction.  This requirement has been put in place to ensure data integrity.  Compensation Service will also monitor completion of error corrections using these EPs and QMS data.
 
EP 930s must use the correct National Quality Error claim label and the National Quality Review special issue indicator.  Rating review corrections should use the Correction of National Quality Error – Rating claim label. Non-rating review corrections should use the Correction of National Quality Review – Non-Rating claim label. 
Exception: As noted in M21-4, Chapter 3.B.c., it is not required to establish an EP 930 if the only citation is for an incorrect date of claim or EP on a closed EP.
 
Notes:
  • The National Quality Review special issue indicator is a ‘Do Not Recall’ (DNR) indicator that prevents National Work Queue (NWQ) recall until the special issue is removed in conjunction with an appropriate transaction.
  • If the EP associated with the claim reviewed for quality is still pending, which is likely following a local quality review, then an EP 930 is not necessary.  Corrective action to include mentoring and entering a VBMS note should be conducted under the existing EP.
  • An EP 930 is required for national errors identified on both STAR reviews and SFRs conducted by QA.
Requests for Reconsideration:
  • EP 930 should not be established by the RO unless QA upholds or mitigates an error on reconsideration. 
  • EP 930 is not necessary if QA overturns an error on reconsideration. 
References:  For more information on the requirement to enter a VBMS note and how to enter one, please see

3.5.f.  Corrective Actions and Reporting

The identified correcting RO must take corrective action on all national errors. 
 
All actions to initiate the correction must be done within 30 calendar days of notification of the error.  If multiple errors are cited on a case, all actions to initiate the correction of all errors must be executed.
 
When corrective actions are initiated, the error correction is considered “complete” for reporting purposes.  
 
If the corrective action needed is development, rating correction, or award promulgation, once executed, the RO must check the “Error Accepted” and “Error Corrected” boxes in QMS and remove the National Quality Review special issue indicator. The EP will be returned to NWQ and redistributed when the EP is actionable for subsequent claim processing by any RO based on capacity.
 
If no further action is needed after the corrective action is taken and reviewed by a supervisor for completion, the EP 930 should be cleared.
 
If the only corrective action is to provide training and/or feedback to the responsible employee, once a supervisor has confirmed the training and/or feedback has occurred, a VBMS note should be entered and the EP 930 should then be cleared.
Important:  Due to the complex nature of errors, some corrections may take extended periods of time to fully correct. For the purposes of error tracking in QMS, errors may be marked as complete upon initiation of corrective actions that will resolve the cited error(s). Any error(s) not immediately and fully resolved should be entered as a permanent VBMS claim note associated with either the EP included on the original review or the National Quality Error EP 930.

3.5.g.  Time Limit for Corrective Action

The correcting RO is required to initiate and report the corrective action taken for each error within 30 calendar days of notification of an error.

3.5.h.  Indicating When Re-Adjudication Is Not Appropriate

In cases in which re-adjudication may be inappropriate, the correcting RO must indicate why re-adjudication is not appropriate and describe other action taken, such as training or feedback provided to the identified responsible employee, when updating the error correction record in QMS.  The clearing RO may also indicate that reconsideration has been requested.  If the reconsideration request is denied, the corrective action must be taken and appropriately reported.

3.5.i.  Clearing RO’s QRT Coach’s Responsibility for Corrective Action

Upon review by the clearing RO’s QRT Coach, or appointed designee, it is determined that a reconsideration request is not warranted, the RO responsible for corrective actions is identified by the RO number at the beginning of each error narrative.
  • When the identified correcting RO is also the clearing RO, the clearing RO will maintain ownership of the correction record(s) and must take corrective actions.
  • When the identified correcting RO is an RO other than the clearing RO, the clearing RO’s QRT Coach must transfer the error correction record(s) to the correcting RO’s QMS Coach Team by selecting “Change Owner” for each error correction record that needs to be transferred. When changing the owner, the correcting station coach team may be selected by using the drop down menu to select “Queue” and then searching for the correction station by name or number.   
The error will remain in “pending notification” status, and this action also confirms that the error has been reviewed and accepted by the clearing RO.

3.5.j. Correcting RO’s QRT Coach’s Responsibility for Corrective Action

The table below outlines the responsibility for corrective action of the correcting RO’s QRT Coach to include
  • notification, QMS actions, and EP 930 establishment with claim attributes
  • changing ownership of the national error correction record in QMS, and 
  • ensuring corrective actions are taken within five (5) business days.  
 StepStep
Action
1
  • Send notification (according to local procedures) of the error correction to the identified responsible employee, and ensure that a copy is sent to the employee’s supervisor.
  • When there is no identified responsible employee, use local procedures to determine who at the RO is responsible for the corrective action
  • In QMS, mark the error correction record as “Notified” when notification is sent to the employee and accept the error correction(s) by marking the “Error Accepted” box within each associated error correction record.
  • Ensure that an EP 930 with the appropriate claim, along with the National Quality Review special issue indicator is established and assigned to the appropriate employee in VBMS. The appropriate claims label will be chosen from the following selections: 
    • Correction of National Quality Error – Non-Rating
    • Correction of National Quality Error – Rating
2
Change ownership of the national error correction record(s) in QMS to the responsible employee.
3
The responsible employee has a maximum of five (5) business days to take corrective action.

3.5.k.  Responsible Employee’s Responsibility for Corrective Action

The table below outlines the responsibility for corrective action of the responsible employee.
 StepStep
Action
1
Take the corrective action and enter mandatory notes in VBMS describing the corrective action taken, date taken, and RO number taking corrective action.
2
Communicate with supervisor to advise required corrections have been completed.
3
The responsible employee has a maximum of five (5) business days to take corrective action.

3.5.l.  Responsible Employee’s Station Responsibility for Corrective Action

The table below outlines the responsibility for corrective action of the responsible employee’s station.
 StepStep
Action
1
Ensure that the corrective action is completed within the required five business day timeframe and the responsible employee has added the mandatory VBMS note.
2
Remove the National Quality Review special issue.
3
Update the error correction record by marking the “Error Corrected” box within each associated error correction record in QMS.
Recommendation: Due to the complexity of many STAR errors, it is recommended that the local Quality Review Team provide oversight on corrective actions that are taken by the responsible employee.

3.5.m.  Error Correction Validation

QA validates the corrective actions taken on select errors cited as part of any national level review.
By marking an error as accepted and corrected, the RO is certifying that all needed actions have been taken and are correct. In the event that QA review shows corrections have not been completed, are insufficient, or contain additional errors, QA will reopen the error correction record and return error correction record to the correcting RO for additional action. A brief summary of QA’s reasons for returning the error correction record may be found in QMS under the ‘Review Comments’ section with an ‘EC Notified Reset’ comment type.
If the error correction record continues to be closed again without sufficient corrective action, QA will escalate its findings to OFO.
If a RO disagrees with QA’s findings that corrective action was insufficient or contained further errors, RO’s are to contact QA at VAVBAWAS/CO/QRT.

6.  Requests for Reconsideration


Introduction

This section describes procedures for requests for reconsideration, including

Change Date

June 5, 2025

3.6.a.  Formally Addressing Disagreements

It is anticipated that occasionally ROs may disagree with the results of a review or believe the explanation is unclear or inadequate.  Any basic disagreement over the correctness of an error citation must be formally addressed.

3.6.b.  Requesting Reconsideration

If a RO believes an erroneous error call has been made, the clearing RO may request a formal reconsideration by QA under the direction of the Compensation Service Quality Assurance Assistant Director.  To request a formal reconsideration of an error, the clearing station must submit the request through QMS.
All errors cited at the national level require a two-step process in QMS in order successfully route the error to the appropriate business line responsible for issuing the reconsideration decision. Failure to properly complete the two-step process results in the reconsideration not being successfully referred for review. It is the completion of the second step of the two-step process that establishes the date the reconsideration was received by QA.
 Note: Reconsideration of errors includes STAR reviews and SFRs.

3.6.c.  Time Limit for Reconsideration Requests

Requests for all national level reconsiderations should be submitted within 10 business days so that timely corrections may take place. The 10 business day submission period begins the day after the “Created Date” shown in the error correction record.
 
QA will not accept reconsideration requests on any errors that are reopened as part of QA’s error correction validation procedures described in M21-4, Chapter 3.5.m, as those errors have already been accepted as being a valid error citation or comment by a RO.  
Any inquiries regarding reconsiderations on QA cited errors or comments should be sent to VAVBAWAS/CO/QRT.  
Important: QA reserves the right to enforce a 10 business day timeliness period at the end of the STAR performance year so that year-end performance data may be provided. While any late submissions will be considered on the merits, any untimely reconsiderations that result in an overturned error may not be reflected in the RO’s performance year data.
Note: Reconsiderations for SFRs will also be considered on the merits. However, for SFR reporting purposes, once the final report is finalized and published on QA’s intranet page, no further reconsiderations will be accepted.

3.6.d.  Misclassified Errors

Compensation Service will not remove BE errors on reconsideration merely because the error was misclassified on the STAR Checklist (e.g. B2 vs. C1) when a legitimate BE error exists.  Removing known errors on cases included in the nationally mandated sample is contrary to sound quality control principles and provides stakeholders with inaccurate data.
Notes:
  • In these cases, the error will be upheld, but the appropriate classification will be discussed in the reconsideration decision narrative in QMS.
  • This process will not affect the ROs right to ask for an additional reconsideration using the secondary process detailed below.

3.6.e.  Formal Reconsideration Requests

The formal reconsideration request must include pertinent
  • supporting statutes
  • regulations
  • CAVC Opinions
  • GC Opinions
  • manual, or
  • other appropriate citations.
The clearing RO must submit the reconsideration request via QMS using the two-step process required for all QA completed reviews.  The reconsideration decision will be made by QA and returned to the clearing RO through current QMS notification procedures.  Results of reconsideration requests will be maintained in QMS and monitored to ensure the effectiveness and integrity of the review process.

3.6.f.  Secondary Reconsideration Requests

ROs will have the right to seek additional reconsideration from Compensation Service on upheld BE errors.  QMS has the capacity to record a secondary reconsideration decision. Submitting and referring a secondary reconsideration for QA review requires the same two-step process as submitting a first-level reconsideration request.
  • Secondary reconsideration requests must be submitted through QMS
  • QRT Coaches may authorize the submission of any secondary reconsideration request.
  • Once a reconsideration decision has been made, any errors or comments that were upheld or mitigated will be returned in QMS to the individual that initiated the reconsideration request.
  • Secondary reconsideration requests should be made within five (5) business days of when the RO receives notification of the first level reconsideration decision.
Important:  Compensation Service reserves the right to alter this timeline at the end of the fiscal year reporting period to ensure timely final quality reports.  If the Deputy Director of Operations for Compensation Service disagrees with the action taken by the QA Staff, the error will be withdrawn.  The case will be returned to the QA Staff to amend the decision as directed, and feedback will be given to ensure that such errors are not cited in the future.

Appendix A.  STAR Rating Quality Review Checklist


Introduction
This appendix includes the

Change Date

January 14, 2026

3.A.a.  National Compensation Rating Quality Review Checklist

The current National Compensation Rating Quality Review Checklist (NCRQR) can be found in the Compensation Service Knowledge Management portal at this link. Upon selection of the STAR program, current checklists will be available. Historic checklists will also be maintained in the Archived section.                                                                                  

3.A.b.  Instructions and Guidelines for Rating Review

These instructions and guidelines have been developed to promote consistency and uniformity in the review of cases selected for the national quality review program.  Use these instructions/guidelines in conjunction with the National Compensation Rating Quality Review Checklist.
 
For each case reviewed, a National Compensation Rating Quality Review Checklist must be completed and all questions answered.  A “YES” response indicates that the activity associated with the question was completed accurately.  A “NO” response indicates that the activity associated with the question was “in error.”  Indicate “N/A” if the question is not applicable to the case under review.  A narrative summary is required with statutory, regulatory, judicial, or manual references for any “error” or “NO” answer recorded.
 
The general guideline is that an error will be recorded when an action is taken that violates current regulations or established policies.  Examples of outcome-related deficiencies include, but are not limited to, errors that result in an overpayment or underpayment to a claimant and deficiencies that would result in a remand from BVA if not corrected. 
 
Procedural deficiencies are not recorded as BE errors.  These deficiencies are recorded as decision documentation/notification or administrative comments and either corrective action must be taken upon these deficiencies or a timely request request for reconsideration must be submitted.  A judgment or a difference of opinion reflecting a possible better practice or solution will not be recorded as a comment under question Question 16.  If an error is identified with an issue not related to the EP under review, that error is also recorded as a comment under question Question 15. 

3.A.c.  Rating Review Elements

The National Compensation Rating Quality Review (NCRQR) is, generally, focused on EPs associated with initial claims (including original claims, new claims, and claims for increase) and supplemental claims.  Other issues such as dependency, income, net worth, withholdings/recoupments, incompetency, etc., when applicable to a case selected for national quality review, will be reviewed as part of that EP.
 
The following is a list of explanations of the questions on the National Compensation Rating Quality Review Checklist.
Question
Explanation
1. Were all claimed issues addressed and decided?
All issues submitted by a Veteran should be formally addressed and decided in some fashion.  Entitlement to an earlier effective date would generally apply only to an appeal, unless such a claim is submitted in conjunction with a clear and unmistakable error (CUE), etc. 
2. Were all inferred and/or ancillary issues addressed?
All inferred issues that arise from the claim should be addressed.  This would include any ancillary issues, such as entitlement to Dependents’ Educational Assistance (DEA) benefits when a permanent and total evaluation is established, and any issue that is “within scope” of a claimed condition (such as a tinnitus grant when hearing loss is claimed and service connection (SC) warranted). 
3. Was VCAA pre-decision "notice" provided and adequate?
38 CFR 3.159(b)(1) states, in part, that upon receipt of a substantially complete application, VA is required to notify the claimant and the claimant's representative, if any, of any information, and any medical or lay evidence, not previously provided that is necessary to substantiate the claim.  As part of that notice, VA is required to indicate which portion of that information and evidence, if any, is to be provided by the claimant and which portion, if any, VA will attempt to obtain on behalf of the claimant.
4. Does the record show VCAA compliant development to obtain all indicated evidence (including a VA exam, if required) prior to deciding the claim?
38 CFR 3.159(c) states, in part, that VA must make reasonable efforts to help a claimant in obtaining the evidence necessary to substantiate a claim.  Therefore, all indicated and necessary development must be completed before deciding a claim unless a grant is warranted based on the evidence of record.
 
If a VA examination report was the basis for a rating decision, was that report adequate and sufficient for rating purposes?  Was there already sufficient medical evidence of record to rate the claim?  (See 38 CFR 3.326(b) & (c)).  While requesting an examination is generally a judgment area with considerable latitude, that judgment must be exercised within a reasonable range.  The record must contain evidence that fully supports the disability determination and not lack any necessary development pertinent to the decision being made.
5. Was the grant or denial of all issues correct?
Does the evidence of record support the decision according to applicable law regulation and policy? 
 
Any error cited in this element must be the equivalent of a CUE.  An error includes failure to allow benefits based upon application of the doctrine of reasonable doubt when a case is in equipoise (38 CFR 3.102).  A judgment variance such as “difference of opinion” or “better rating practice” will not be considered an error or noted in a comment as QA does not make best practice suggestions at this time.
6. Was the percentage evaluation assigned correct (including combined evaluation)?
Generally, an error in this category may only be cited when supported by evaluation tools, such as the Evaluation Builder.  If the Evaluation Builder was not used by the decision maker, then an error may still be cited if the evaluation is not supported by the evaluation tool or is not in compliance with the Rating Schedule.  The only possible judgment variance is when the evidence of symptomatology is divided between two evaluation criteria and the disability picture is not clear enough to conclusively apply 38 CFR 4.7.
7. Are all effective dates affecting payment correct?
This category encompasses intent to file (ITF), date of claim (DOC), and increases during the review period as well as various individual unemployability (IU) scenarios.  Also covered here are incorrect effective dates for ancillary benefits.
8. Were all payment rates correct?
If applicable to the case being reviewed, issues such as dependency, income, withholdings and recoupments, hospitalization, etc., must be considered when deciding whether the payment rates are correct.
9. Was Decision Documentation correct?
Decision documentation errors involve serious deficiencies in the explanation provided to the claimant concerning the benefit decision.  Deficiencies that distort the actual decision so that the claimant may be confused as to what benefit(s) were granted or denied should be recorded as decision documentation errors.  Deficiencies that distort the basis for the decision by omitting or incorrectly categorizing evidence that supports a different outcome than was made will also be cited as decision documentation errors.
10. Was notification correct? (Notification)
This element includes predetermination and contemporaneous notice, when applicable (38 CFR 3.103).
  • It is essential that correspondence to claimants be viewed, to the extent possible, from the claimant’s perspective.  Notification must:
    • be factually correct,
    • address all issues,
    • be as direct and concise as possible,
    • be logically laid out so thought sequences are not broken, and
    • be free from apparent contradictory statements.
  • Notice of procedural and appellate rights is required following every decision.  This may be furnished by attachment of VA Form 20-0998, Your Right To Seek Review Of Our Decision.
  • The POA information should be updated in VBMS to reflect the appointment of a POA to computer-generated notices are furnished to both. 
11. Were Appropriate Signatures (Internal Controls) correct?
The appropriate signature has been added for internal control purposes only.  It is a means of checks and balances to eliminate potential fraud situations. This does not refer to ratings which require more than one signature
12. Was the end product selected for review timely developed? (over-developed)
To be an overdevelopment error, the development must clearly have been erroneous (e.g. ordering an examination for a condition for which SC could not be established due to a statutory bar) and materially affect the claim (e.g. delay claim processing in and of itself).  Mere differences of opinion regarding whether or not the evidence of record was sufficient to decide a claim without an examination are not valid quality errors.
 
This question is used only for data-gathering purposes. Citations under this question are not classified as BE errors, and therefore are not reflected in the national or individual station accuracy.  Details provided in this category will focus only on scenarios where development was obviously improper or unnecessary to complete the claim. 
13. Were Examination & Medical Opinion Requests correct?
This question captures examination and medical opinion deficiencies that do not rise to the level of a BE error for purposes of national quality review. The focus for the “H” category is for recording a gross waste of resources rather than any DTA error. 
It is not cascading to select “YES” for Question 12 and “NO’ for 13 (H1).
The reviewer should also select “YES” if the claims folder was available in electronic format and the examiner stated that it was reviewed.
14. Was there an Expedited Favorable Decision?
An intermediate rating decision is appropriate if the record contains sufficient evidence to grant any benefit, including SC at a noncompensable level,   even if decisions regarding even though the issue of SC or compensation for other disabilities or the issue of a higher evaluation must be deferred.
15. Were Rating Comments correct (EP not under review)?
Identified in this question are discrepancies associated with other EPs that would have otherwise been considered as errors had the EP in question been under review.
16. Were Rating Comments correct (EP under review)?
Identified in this question are discrepancies in the EP under review that are not considered errors in the EP under review but that require correction.

Appendix B.  STAR Non-Rating Quality Review Checklist 


Introduction

This appendix includes the

Change Date

January 14, 2026

3.B.a. National Compensation Non-Rating Quality Review Checklist

The current National Compensation Authorization Quality Review Checklist (NCAQR) can be found in the Compensation Service Knowledge Management portal at this link. Upon selection of the STAR program, current checklist will be available. Historic checklist will also be maintained in the Archived section.

3.B.b.  Instructions and Guidelines for Non-Rating  Review

These instructions and guidelines have been developed to promote consistency and uniformity in the review of cases selected for the national quality review program.  Use these instructions/guidelines in conjunction with the National Compensation Non-Rating Quality Review (NCAQR) checklist.
 
For the purpose of measuring technical accuracy under the national quality review program, a case is considered either “accurate” or “in error.”  A case will be considered “in error” only if a BE error is identified on the case. When a BE error is noted, the error narrative summary will begin with “Benefit Entitlement” and Question 13 (Does this Review contain a traditional BE?) will have a “YES” response. The error narrative summary for a non-BE error will begin with “Comment” and does not impact the BE accuracy of the case.     
 
For each case reviewed, a National Compensation Non-Rating Quality Review checklist must be completed and all questions answered.  A “YES” response indicates that the activity associated with the question was completed accurately.  A “NO” response indicates that the activity associated with the question contained a discrepancy resulting in either a comment or BE error.  Indicate “N/A” if the question is not applicable to the case under review.  A narrative summary is required with statutory, regulatory, judicial, or manual references for any “NO” answer recorded. 
 
The general guideline is that an error will be recorded when an action is taken that violates current regulations or established policies.  Examples of outcome-related deficiencies include, but are not limited to, errors that result in an overpayment or underpayment to a claimant. 
 
Procedural deficiencies are not recorded as errors.  These deficiencies are recorded as comments under Question 12.  However, if the procedural deficiency is severe in nature, it will be recorded as an error.  A judgment or a difference of opinion reflecting a possible better practice or solution is recorded as a comment rather than an error.  If an error is identified with an issue not related to the EP under review, that error is also recorded as a comment under Question 12.

3.B.c.  Non-Rating Review Elements

The following is a list of explanations of the questions on the National Compensation Non-Rating Quality Review Checklist.
Question
Explanation
1. Was proper pre-decisional notification provided and/or was proper development to the Veteran/claimant completed as required by regulations and/or the manual?
38 CFR 3.159 states that upon receipt of a substantially complete application, VA is required to notify the claimant and the claimant's representative, if any, of any information, and any medical or lay evidence, not previously provided that is necessary to substantiate the claim.  As part of that notice, VA is required to indicate which portion of that information and evidence, if any, is to be provided by the claimant and which portion, if any, VA will attempt to obtain on behalf of the claimant.
 
The basic rule concerning notice is contained in 38 CFR 3.103.  Within that regulation, at 3.103(b)(2), are provisions for due process associated with adverse actions.  Additional instructions for implementation are found in M21-1, Part I, Subpart i, Chapter 1, Section B.  Strict adherence to these procedures is necessary both from the customer’s perspective and the government’s.
 
This also includes initial or supplemental development letters to the Veteran/claimant to establish dependency entitlement prior to the decision phase of the claim.
 
Examples of overdevelopment in this task may consist of an additional 5103 Notice Letter being sent when not needed and requiring 30 days before being able to move the claim forward to the next stage (e.g., ready for decision), or requesting dependency information when it is already of record preventing the dependent being added at that time.
2. Were all pertinent service treatment records (STRs) obtained / requested or determined to be of record?
An error would be cited when station failed to obtain the STRs or National Guard/Reserve records when required. This would also include when only partial records were requested or records were improperly requested.  A failure to have the final notification letter of record would also constitute an error in this task.
STRs requested directly from the Veteran would be assessed in Task 1.  STRs from the National Personnel Records Center (NPRC) or other agency would fall under Question 2.
An example of overdevelopment in this task would be trying to obtain National Guard or Reserve records when the event was identified during a period of active duty (AD) and shown in the AD STRs.  Further development would not aid in the claim for service connection.  Another example of overdevelopment would be when STRs are of record but a PIES O50 is requested to obtain STRs.
3. Were all pertinent Federal records (other than STRs) obtained / requested or determined to be of record?
All Federal records need to be obtained when identified by the Veteran.  This would include Social Security Administration (SSA) records, Veterans Affairs Medical Center (VAMC) records, Vet Center records etc.  Failure to obtain records at the time of identification by the Veteran or at initial development would be an error.  This could delay the claim or cause other deficiencies such as missed examinations and/or medical opinions. If a Veteran identifies records and the station does not obtain those records, this would be an error under this task. If the station did not conduct a search and associate relevant unidentified VAMC records, this would be an error under this task. However, the station will not be held accountable for identifying and uploading non-VAMC records that the Veteran did not identify.
An error would be cited if a final notification letter or equivalent is not completed.
An example of overdevelopment in this task is requesting and waiting for personnel records (DPRIS or PIES O50) when the records are already included in the evidentiary record.  Another example could be trying to verify active duty training (ADT) or inactive duty training (IADT) service when the claimed disability began during a period of verified AD, thereby preventing the claim from moving to the next step (examination, rating board, etc.).
4. Were all pertinent private / non-Federal records obtained / requested or determined to be of record?
An error would be cited if private treatment records were not requested.  This would include the required follow-up request.  This could include medical records or non-medical records such as employment records for the Veteran or claimant.
 
Examples of overdevelopment in this task would include attempting to obtain private medical records (PMRs) when already of record or the required number of requests were completed, as well as asking for a new release for records when a valid release was already of record.
5. Were all necessary examinations / medical opinions requested and correct?
An error will be cited when all necessary examinations and/or medical opinions are not requested.  An error would also be cited if the incorrect exam/Disability Benefits Questionnaire (DBQ) is requested, and not all disabilities are identified in the request, or critical information is not identified in the request such as private treatment records, VAMC records, Veteran’s statements, or STRs (event in service).
An error will also be cited if unnecessary examinations are requested regardless of whether this prevented the claim from moving to the next step.  An example of an unnecessary examination would be one requested when the Veteran claimed service connection for high cholesterol, which is considered to an abnormal laboratory finding and not subject to SC.
6. Were all issues addressed and decided?
A “claimed issue” is any benefit specifically mentioned by the applicant or authorized representative.
 
Errors would include not conveying all the issues decided by a rating decision if the portion of the rating decision provided to the Veteran/claimant did not include those decisions, and hence, the Veteran is not receiving any notification on the outcome of that issue.  The VSR is also responsible for ensuring the rating decision addressed all issues. 
 
Furthermore, the VSR is evaluated on if all issues were appropriately addressed and all administrative issues decided (issues not requiring a rating). 
 
Dependency errors are cited under this task only when a claimed dependent is not addressed.  All other dependency errors should be captured under the appropriate task.
 
Failing to address pension administratively when appropriate would fall under this task. An example of premature award of benefits prior to determining eligibility would be administratively granting pension without verifying the qualifying service first.
7. Was necessary award or administrative decision generated/completed and correct?
This question encompasses all situations where an award was generated, or should have been. This includes erroneously cleared claims.  Errors would include: failing to implement payment changes based on a rating decision or incorrectly implementing such a decision and failing to correctly pay based on benefits awarded, discontinued, or adjusted administratively. 
 
Payment errors resulting from withholdings of administrative reductions or dependency adjustments would not be indicated under this task.
8. Were all dependency adjustments and/or decisions correct?
This question includes all awards/decisions involving the addition, denial, removal, and change in status of dependents based on the promulgation/authorization activity.
Examples of errors in this task would include adding ineligible dependents to an award, removing or denying eligible dependents from an award, adding or removing dependents or changing a dependent's status from an incorrect date, and erroneously changing or failing to change the status of a dependent.  Establishing an incorrect future date for the removal or change in status of a dependent is also an error.
This question also includes errors involving premature dependency adjustments.  Error examples include a VSR establishing a dependent prior to obtaining the Social Security Number (SSN) or removing a stepchild when the Veteran divorces the parent without determining whether the Veteran still supports the child.
For error trend purposes, if multiple dependency adjustments/decisions are involved, only select the error descriptions that are in error. 
For example, a Veteran submits a claim to establish a spouse, a biological child, and a stepchild.  The VSR correctly added the spouse to the award; however, the biological child was added from an incorrect effective date and the stepchild was added without the Veteran furnishing requested necessary evidence to establish entitlement.  The reviewer would select the error descriptions for effective dates and stepchildren.
9. Were all required withholdings / reductions correctly implemented?
This question encompasses all such payment adjustments requiring VSR input/decision.  This includes retired pay withholdings, severance pay withholdings, drill pay waivers, hospitalization adjustments, incarceration adjustments, return to active duty adjustments, etc.  Rating reductions are addressed under Question 7.  As with all questions, this encompasses not just whether the adjustments the VSR made were correct, but whether the VSR failed to implement any and all adjustments covered by this question.
10. Was the claimant properly notified?
38 CFR 3.103 contains the basic rule. Claimants and authorized representatives are entitled to timely notice of any decision made by VA. This rule applies to both awards and disallowances. 

Notification letter(s) must be placed in the claims folder or in the electronic record(s). The decision notice must not be in a “Draft” status in the Package Manager. The decision review period does not begin until the claimant and representative are notified of the decision.  Information must be complete and accurate.  Evidence used to decide the claim must be included in every notification letter.  Notice of procedural and review rights is required following every decision.  POA must be properly copied on the notification letter (e.g., private attorney addresses).

Errors under this task also include notifications to the claimant regarding POA appointments.  For example, errors regarding notification to the claimant of an incomplete appointment or notification when the appointment form lacks 38 U.S.C.7332 election.
11. Were all systems accurately updated?
Systems compliance is required.  Utilize the error descriptions in this question to determine systems compliance errors.  Only “Yes” or “No” are acceptable answers for Question 11.  “NA” is not an acceptable answer for Question 11.
Only errors that fall under the specific error descriptions on the checklist are considered systems compliance errors.  Errors would include: not utilizing the correct EP and DOC (this includes companion EPs), not updating VBMS with the necessary service information, and not updating mailing and payment addresses.  Not inputting all claimed issues as contentions and verifying the contention is an error.  Furthermore, incorrectly granting POA access or failure to update appropriate systems to remove a revoked POA is an error.  This includes accepting an invalid form.  Incorrectly inputting and updating tracked items for all requested evidence is an error under this task.  This includes correctly utilizing dispositions.
 
Any required systems updates that do not fall under the specific error descriptions of this section are not errors and should be indicated as remarks and returned for correction.  For example, VBMS indexing and inputting VBMS notes are not errors under this task. Contention classifications and contention types are also not considered errors under systems compliance.
Please note: An incorrect DOC or EP is still a systems compliance error even if the EP is closed and the DOC/EP cannot be corrected.  DOC/EP errors can only be corrected prior to the claim being closed.  If a DOC/EP error is identified on a closed EP, the error should be cited under Question 11; however, corrective action may not be required. It is not appropriate to establish an EP 930 when the only error was for an incorrect DOC or EP and the EP is now closed.
12. Were all other issues that required correction completed correctly?
Identified in this question are discrepancies associated with other EPs that would have otherwise been considered errors had the EP in question been under review.  Comments do not count as errors under the EP under review. 
13. Does this Review contain a traditional BE?
Answer Yes if a benefit entitlement error is identified during the review.

Attachments