M28C.V.B.1 Fiscal Responsibilities

Table of Contents Glossary of Terms VR&E Resource
Previous Chapter   Next Chapter
.

WMK1

 CHAPTER 1

FISCAL RESPONSIBILITIES

1.01  General Information

a.  Case Manager Responsibilities

b.  Veteran Readiness and Employment Officer

1.02  Levels of Authority for Program Costs

a.  Program Costs

b.  Program Costs Approval Levels

c.  Documentation

d.  Increase in Program Costs that Exceed Cost Approval

e.  Program Costs Not Approved

1.03  Vendorization

a.  Overview

b.  Purpose

c.  Procedures

d.  Vendorization of Multiple Locations of Same Facility

1.04  Budget Object Codes

a.  General Operating Expenses

b.  Educational Vocational Funds

c.  Readjustment Benefits Account

1.05  High Dollar Invoice Approval Levels

a.  Tuition Approval Threshold

b.  Books Approval Threshold

c.  Supplies Approval Threshold

1.06  Facility Invoices

a.  VAAR 831.7001-1

b.  Public Law 111-377

c.  In-State Tuition

1.07  Authorization for Services, Supplies, and Training

a.  Method for Authorization

b.  Authorization for Training at More than One Facility

c.  Authorization for Supplies and Other Services

d.  VA cancels an e-Authorization

e.  Vendor rejects an e- Authorization

f.  Facility Codes


1.01  General Information

(Change Date November 7, 2013)

Veteran Readiness and Employment (VR&E) staff are responsible and accountable for the appropriate authorization and processing of fiscal transactions. The case manager must ensure correct application of the laws and regulations concerning all fiscal transactions. VR&E fiscal oversight ensures that the case manager processes fiscal transactions with accountability, honesty, and good judgment.

a. Case Manager Responsibilities

(Change Date November 7, 2013)

The case manager is responsible for determining that supplies are necessary for the Veteran to complete his or her program as outlined in  38 Code of Federal Regulations (CFR) 21.210 through 21.222 prior to approving the purchase of any supplies. 

The case manager must also be proficient in the correct use of procurement procedures, including the use of the government purchase card. Refer to M28C.V.B.4 for additional information on the government purchase card.

b. Veteran Readiness and Employment Officer

(Change Date November 7, 2013) 

The VR&E Officer is responsible for ensuring that all fiscal transactions performed by the VR&E staff are accurate and appropriate. He or she would know the performance level of each employee assigned within his or her supervision to ensure that all fiscal transactions meet the acceptable level of quality. 

The VR&E Officer must ensure that an appropriate VR&E staff member has a delegated authority to commit the Government to purchase services, supplies, or equipment. 

Refer to: M28C.V.B.3 for contracting responsibilities.


1.02  Levels of Authority for Program Costs

(Change Date November 7, 2013)

In accordance with 38 CFR 21.430, VR&E must maintain policies and procedures that provide accountability in the authorization and payment of program costs for training and rehabilitation services. As part of a Veteran's rehabilitation program planning, the case manager must estimate the annual program costs for services outlined in the Veteran’s rehabilitation plan.

There are three different levels of authority for approval of program costs. Refer to section b below for the approval levels of program costs.

Note: Program costs should not restrict the types of services provided to any Veteran, since services are based on the identified needs and corresponding services outlined in the Veteran's rehabilitation plan. 

a.  Program Costs

(Change Date January 18, 2023)

Program costs include, but are not limited to, tuition, books, fees, supplies, equipment, and special services and assistance. Program charges do not include subsistence allowance and Revolving Fund Loan (RFL).

The program costs approval threshold for a Vocational Rehabilitation Counselor (VRC) is $50,000 annually. If the program costs exceed the VRC’s approval level, the VRC must complete and submit the high program costs memo to the VR&E Officer. If necessary, the VR&E Officer forwards the request to the RO Director for appropriate level of concurrence, and if necessary, the RO Director forwards the request to the Executive Director of VR&E Service through the Field Services Mailbox.  

The high program costs memo must include the estimated annual program costs for the Veteran's entire training period. For example, if the estimated costs for the first year of a four-year program are $55,000, the VRC may assume that the estimated costs for the following three years will also exceed $55,000 and must indicate this on the high program costs memo. If approved, the high program costs memo covers the entire training period indicated in the plan, assuming there is no change in the Veteran's training facility or vocational goal during that period. 

The rehabilitation plan must not be signed by either the VRC or the Veteran until all required approvals are obtained. 

Refer to: M28C.IV.C.2 for additional information on high program costs.

Note: Program costs are estimates only, and other factors may affect actual costs in subsequent years, e.g., tuition increases, a Veteran opting to attend a summer session for one year, etc. The case manager must complete and/or amend the high program costs memo for that year if the program costs increase and exceed the threshold level.

In addition, a VRC cannot approve annual program costs exceeding $25,000 for any of the following rehabilitation plans as outlined in 38 CFR § 21.430:

  1. Self-employment plan as outlined in M28C.IV.C.5 
  2. Extended Evaluation plan as outlined in M28C.IV.C.3 
  3. Independent Living plan as outlined in M28C.IV.C.6 

b.  Program Costs Approval Levels

(Change Date June 21, 2023)

Approval for program costs is delegated to the VRC, VR&E Officer, Regional Office (RO) Director, and Executive Director, VR&E Service based on the estimated annual costs of services for Veterans participating in the Chapter 31 program. 

The levels of approval are as follows:

1.  Vocational Rehabilitation Counselor 

(Change Date January 18, 2023)

The VRC may approve rehabilitation plans with annual costs of up to $50,000, except for the following rehabilitation plans:

a) Self-employment plan

b) Independent living plan

c) Extended evaluation plan

2.  Veteran Readiness and Employment Officer

(Change Date June 18, 2026)

The approval of the VR&E Officer must be obtained for the following program services and costs. 

a)  Program Costs 

The responsibility for approving the following program costs is delegated to the VR&E Officer and cannot be delegated to any designee as specified in 38 CFR 21.430: 

  • Rehabilitation plan with annual costs of $50,000 to $75,000 
  • Retroactive inductions 
  • Individualized Extended Evaluation Plan (IEEP) with program costs that exceed $25,000 
  • Rehabilitation plan that contains the VR&E Housing Adaptation Grant with costs up to the SAH limit 
  • Rehabilitation plan with program costs of up to $2,000 that includes construction using Acquisition 
  • IILP with program costs of up to $75,000 for a calendar year and does not contain construction 
  • Self-employment plan with program costs of up to $49,999 
  • Reimbursement for purchase of a firearm (including authorized ammunition and firearm parts) 
  • High Dollar Invoices (38) CFR 21.430 

Note: When the VR&E Officer is also the assigned case manager for a firearm reimbursement, the concurrence of the Regional Office Director or Assistant Director is required in lieu of VR&E Officer self-approval. 

 b)  Rehabilitation Plan and Extension of Period of Services 

 The responsibility for the following approvals is delegated to the VR&E Officer and may be delegated to a designee: 

  • Extended evaluation that exceeds the 12-month period (38 CFR 21.74) 
  • Entitlement that exceeds 48 months ( 38 CFR 21.78) 
  • Individualized Independent Living Plans (IILP) (38 CFR 21.162) 
  • IILP that exceeds the 24-month period, but does not exceed the 36-month period (38 U.S.C. 3105(d)) 
  • Special Employer Incentive (SEI) program that exceeds the six-month period (38 CFR 21.256)
  • Overturning previous rehabilitation decision for a case that is reopened less than one year from the date of closure 
  • Overturning previous discontinuance decision using Maximum Rehabilitation Gain (MRG) for a case that is reopened less than one year from the date of closure 

3.  Regional Office Director

(Change Date June 18, 2026)

The Regional Office (RO) Director must approve the following program and costs: 

  • Rehabilitation plan that exceeds the program costs of $75,000-$100,000 per calendar year 
  • IILP with program costs of $75,000 to $100,000 and does not include construction 
  • IILP that includes construction costs between $2,000 and $15,000 using Acquisition 
  • High Dollar Invoices (38 C.F.R. § 21.430)

4.  Executive Director, VR&E Service

(Change Date June 21, 2023)

The Executive Director of VR&E Service must approve the following program and costs:

  • Rehabilitation plan with program costs that exceed $100,000 per calendar year
  • Self-Employment plan with program costs that exceed $49,999
  • Rehabilitation plan that does not include IL construction costs of services that exceed $100,000 per calendar year using Acquisition
  • Rehabilitation plan that includes IL construction costs that exceed $15,000 using Acquisition
  • Rehabilitation plan that includes a VR&E Housing Adaptation Grant that exceeds the SAH grant limit
  • IILP that exceeds the 36 month period

c.  Documentation

(Change Date November 7, 2013)

When a Veteran’s program costs exceed the Vocational Rehabilitation Counselor's level of authority, the case manager must prepare a memorandum detailing the program costs. This memorandum must include appropriate concurrence lines. The High Cost Memo is located in CWINRS under the Rehabilitation Tab and can be accessed by clicking “View Plan” and choosing the “High Cost Memo” button.

The case manager must review estimated program costs during each annual review of the rehabilitation plan to ensure that the costs have not increased since the rehabilitation plan was implemented. However, program costs approval thresholds are based on a calendar year.

d.  Increase in Program Costs that Exceed Cost Approval

(Change Date November 7, 2013)

When the case manager determines that a Veteran’s actual program costs will exceed the original estimated cost, the case manager must consider whether the program requires a higher level of concurrence. If the case manager determines that the new cost projections exceed the approved limit, he or she must seek the appropriate level of concurrence. In this instance, the Veteran will continue with his or her planned program while the case manager obtains the appropriate cost approvals.

e.  Program Costs Not Approved

(Change Date February 19, 2019)

If program costs are not approved by the appropriate authority, then the case manager must inform the Veteran of the denial by letter and must explain the reason for the denial using Vocational Rehabilitation VR-58, Chapter 31 Adverse Decision Letter and VA Form VAF 20-0998, Your Rights to Seek Further Review of our Decision.


1.03  Vendorization

a.  Overview

(Change Date November 7, 2013)

Vendorization is the process that allows vendors' information to be entered into the Financial Management System (FMS). This is a prerequisite to processing payments for facilities, contractors, and other service providers. Vendors who provide services or supplies to Chapter 31 Veterans must be vendorized by submitting either a Tax Identification Number (TIN) or a Social Security Number (SSN) to the Financial Management System (FMS) before the Treasury Department releases a payment through this system.

b.  Purpose

(Change Date July 2, 2014)

Any vendor that will be submitting invoices to VA must be vendorized or set up in the FMS by the Financial Services Center (FSC) Vendorizing Unit (0473A1) in Austin, Texas, so that payments can be made for services. In accordance with the Debt Collection Improvement Act of 1996, the majority of the federal payments must be made by Electronic Funds Transfer (EFT).

c.  Procedures

(Change Date October 1, 2020)

All requests must be submitted using the webform in the Customer Engagement Portal (CEP) at https://www.cep.fsc.va.gov/. All requests will be processed within one to five business days. The vendor must register in CEP using ID.me. The vendor must register only once and must use their ID.me username and password when accessing the site.

d.  Vendorization of Multiple Locations of Same Facility

(Change Date November 7, 2013)

In some situations, a vendor may have established centralized accounts to receive payments for services provided to Veterans who are training either on-line, at the main campus, or at a branch or satellite campus. The facility location for enrollment authorization must be identified correctly. The locations and addresses are displayed in IPPS in the Search for Vendor Section of the Authorization Form. For more information on Vendor Search, refer to the IPPS User Guide.


1.04  Budget Object Codes

(Change Date November 7, 2013)

Budget Object Codes (BOC) reflect the nature of financial transactions when obligations are first incurred and are an expansion of the associated object classes. Object classes are categories or accounting identifiers that code financial obligations according to the nature of the services or items purchased by VA. The object class is used throughout the Federal Government.

The budgets for General Operating Expense (GOE) and Educational Vocational (Ed/Voc) funds are set by the Office of Field Operations (OFO) and distributed to RO accounts. Applicable funds must be available and appropriately allocated prior to any contracting action. The person making the expenditure will be in violation of the Anti-Deficiency Act and can be held personally liable and responsible for reimbursing the government for unfunded expenditures. Readjustment Benefits (RB) funds are not subject to a budgetary limit but must be closely monitored in CWINRS and/or CAATS.

VR&E utilizes the following three fund types in the provision of services to Veterans participating in the VR&E Program:

a.  General Operating Expenses

(Change Date November 7, 2013)

GOE funds are used to provide services considered inherently governmental to mitigate staffing gaps or provide more geographically convenient or timely services to Veterans. This includes services typically provided by case managers and actions that approve and/or pay benefits for Veterans.

This fund type corresponds to the following BOC categories:

  • 2504:  Initial Evaluation
  • 2505:  Case Management
  • 2506:  Employment Services

b.  Educational Vocational Funds

(Change Date July 15, 2022)

Educational and Vocational (Ed/Voc funds) are used to provide services to Veterans eligible to receive Ed/Voc counseling under Chapters 30, 32, 33, 35 (including Special Restorative Training [SRT] and Specialized Vocational Training [SVT]), and 1607. Although these funds are a part of the readjustment benefit costs for VA, the costs recorded in this account are governed by a statutory $6 million limitation per fiscal year. 

This fund type corresponds to the following BOC category:

  • 4192:  Non-Chapter 31 Contract Counseling 

c.  Readjustment Benefits Account

(Change Date November 4, 2022)

Readjustment Benefits (RB) funds are used to provide services to Veterans participating in the VR&E Program, including BOC categories in the 4000 series. RB funds are not subject to a budgetary limit but must be closely monitored. 

This fund type corresponds to the following BOC categories:

  • 2504:  Initial Evaluation
  • 2505:  Case Management
  • 2506:  Employment Services
  • 4192:  Non-Chapter 31 Contract Counseling
  • 4107:  Tuition and fees
  • 4108:  Books
  • 4109:  Supplies
  • 4112:  Handling Charges
  • 4113:  Tutorial
  • 4114:  Mandatory Taxes
  • 4118: Shipping Fees
  • 4150:  Required Equipment
  • 4155:  One-time Miscellaneous Items

1.05  High Dollar Invoice Approval Levels

(Change Date August 26, 2019)

The following levels of approval are required for single invoices that are considered high dollar invoices. 

a.  Tuition Approval Threshold

(Change Date August 26, 2019)

  • Case Manager: Less than $25,000.00
  • VR&E Officer: $25,000.00 to $49,999.99
  • RO Director: $50,000.00 to $99,999.99
  • Executive Director of VR&E Service: $100,000.00 or greater

b.  Books Approval Threshold

(Change Date August 26, 2019)

  • Case Manager: Less than $5,000.00
  • VR&E Officer: $5,000.00 to $9,999.99
  • RO Director: $10,000.00 to $14,999.99
  • Executive Director of VR&E Service: $15,000.00 or greater

c.  Supplies Approval Threshold

(Change Date August 26, 2019)

  • Case Manager: Less than $5,000.00
  • VR&E Officer: $5,000.00 to $9,999.99
  • RO Director: $10,000.00 to $14,999.99
  • Executive Director of VR&E Service: $15,000.00 or greater

These thresholds only apply to a single invoice and should not be confused with the High Program Cost approval levels, which are related to the total cost of services approved in a calendar year (CY) as outlined in M28C.IV.C.2.

For example:

If a case manager receives an invoice, totaling $20,000, for a Veteran for the spring term and then another invoice, totaling $15,000, is received for the summer term, and then a third invoice, totaling $20,000 is received for the fall terms of the same CY, the case manager has the approval level to authorize all three invoices since none of the invoices exceeds the $24,999.99 threshold. However, using the same example, because the total cost of the services exceeds the annual $50,000 high program cost threshold in one calendar year, a high program cost memo must be signed by the VR&E Officer and filed in the Veteran's VR&E record.

The VR&E Officer or Assistant VR&E Officer and the RO Director roles in IPPS are assigned for each VR&E office. If an invoice is received that requires the Supervisor or RO Director's approval and the VR&E office does not have a user assigned to that role, the invoice will remain in the Pending-High Value Invoice Review status and will not go to FMS for payment processing.


1.06  Facility Invoices

(Change Date November 7, 2013)

A case manager must consider the following specific guidelines when reviewing and approving a facility's invoice.

a.  VAAR 831.7001-1

(Change Date November 7, 2013)

In accordance with VAAR 831.7001-1, when federal funds pay the total cost of instruction, or grants from the Federal Government pay a portion of the cost, that subsidy must be taken into consideration in determining the charge to VA.

The following guidelines are derived from VA policy and regulations:

VA pays in arrears directly to the institution all vouchers for the Veteran's tuition, required fees, books and supplies. Therefore, VA must not be billed for a particular term or semester until after any drop/add period for that term has ended. The Veteran under Chapter 31 or dependent under Chapter 18 should not have his or her registration canceled for non-payment of these expenses, since VA has obligated payment for that term.

VA should be billed only for the actual cost for tuition and fees assessed by the institution for the program of education after the application of:

  1. Any waiver of, or reduction in, tuition and fees; and
  2. Any fellowship, scholarship, grant-in-aid, assistantship, or similar award, or other federal, state, instructional, or employer-based aid or assistance that is provided directly to the institution and specifically designated for the sole purpose of defraying tuition and fees, with the following exception:
  1. If the award limits its use to payment of tuition, fees, or any charge that VA normally pays as part of a Veteran's rehabilitation program, then VA will pay the portion of the charges remaining after applying the award.
  2. In all other cases, VA will pay the full amount of the tuition, fees, or other charges unless a state or other government authority waives the Veteran's tuition and fees. In this situation, VA will reduce the payment of charges by the amount of the waiver.

If the Veteran receives assistance that is not specifically designated for tuition and fees (funds that may be disbursed directly to the Veteran) from a federal, state, or private contribution, the VA will not deny or reduce a Chapter 31 payment on behalf of the Veteran unless the Veteran actually applies such funds to tuition and fee charges. If the Veteran chooses to apply such assistance to tuition and fees, the school should then reduce its bill to the VA by an equal amount.

Reimbursement of duplicate funding or errors in accounting: All errors in accounting or in disbursing funds should be corrected by the school, and any funds that are unused by the Veteran or recouped from another source should be returned to the appropriate funding source, including VA. It is the school's responsibility to contact the agency that created the duplication and arrange the return of any unused funds.

b.  Public Law 111-377

(Change Date November 7, 2013)

In accordance with Pub.L. 111-377, facilities are not required to apply for loans, or any funds provided under section 401(b) of the Higher Education Act of 1965 (Pell grant) before billing the VA. The Pell grant is designed to provide a foundation of financial aid to help defray education costs, including living expenses.

c.  In-State Tuition

(Change Date July 30, 2021)

Effective for courses, semesters, or terms beginning after March 1, 2019, all public IHLs must charge the resident rate to Chapter 31 Veterans and to individuals previously covered under 38 U.S.C. § 3679(c).

Refer to: M28C.IV.C.2 for additional and updated information on in-state tuition.


1.07  Authorization for Services, Supplies, and Training

(Change Date July 1, 2022)

An authorization notifies the training facility that a Chapter 31 Veteran is approved by VA to attend a training program or course and that VA is responsible for payment of the Veteran’s tuition, fees, books, and supplies. The end date of the authorized enrollment period must not be more than 1 year from the start date.

Prior to processing an authorization, an Individualized Written Rehabilitation Plan (IWRP) must be developed upon determination that the Veteran needs a period of training and rehabilitation services to develop the skills necessary to obtain and maintain suitable employment. Refer to M28C.IV.C.2 for procedures on plan development and redevelopment.

a.  Methods for Authorization

1.  Authorization via Invoice Payment Processing System

(Change Date November 4, 2022)

The case manager must create authorizations in the Invoice Payment Processing System (IPPS) for training, services, and supplies, authorize training facilities or vendors to provide services and supplies to Chapter 31 Veterans, and authorize payments to approved vendors. The authorization via IPPS is also referred to as an e-Authorization. If a school certifies enrollment for more than one year, a new authorization must be submitted for the period that extends beyond one year. At least one service on the new authorization must be selected, even if no additional invoices are expected to be submitted for the authorization.

Note: This process is to allow the authorization of a subsistence allowance beyond one year when a facility has invoiced for an entire term longer than one year, such as a 15-month cosmetology program.

The training must be outlined in the Veteran’s rehabilitation plan as an intermediate objective prior to the case manager’s issuing the authorization.

Case managers must use the appropriate Budget Object Code(s) (BOC) when authorizing services in IPPS as follows:

  • BOC 4107: Tuition and Fees
  • BOC 4108: Required Books
  • BOC 4109: Required Supplies
  • BOC 4112: Handling Charges
  • BOC 4113: Required Tutorial Services
  • BOC 4114: Mandatory Taxes
  • BOC 4118: Shipping Fees
  • BOC 4150: Required Equipment
  • BOC 4155: Required One-Time Miscellaneous

The case manager must check the appropriate BOC box for the services being authorized for the Veteran. The facility code identified on the authorization in IPPS must be the same facility code the SCO uses when certifying training in Enrollment Manager.

  • If the facility codes do not match, the case manager must request that the SCO update Enrollment Manager with the facility code identified in the IPPS authorization. 
  • If Enrollment Manager is not updated within 3 business days of this request, the case manager must process the subsistence allowance payment using the facility code identified on the IPPS authorization to avoid a delay. 

The case manager must clearly document these actions in electronic case notes to prevent a potential fiscal error in the processing of subsistence allowances when facility codes do not match between IPPS and Enrollment Manager. 

Once an e-Authorization is completed, a unique authorization number is assigned to track and report the status of the authorization.

In addition, a system-generated email will be sent to the point of contact listed in the service provider email. This notifies the facility that an e-Authorization is now available in the Tungsten Network. Refer to the IPPS User Guide and Transition to e-Authorization and e-Invoicing Playbook for more information on how to authorize and approve payments in IPPS.

2.  Authorization using VAF 28-1905, Authorization to School, On-Job-Training Establishment or Facility

There are two circumstances when VAF 28-1905 may be used for authorization:

  1. When a facility is in a foreign country since payments to these facilities cannot be processed in IPPS.
  2. When payments for services or supplies will not be billed by the facility, such as OJT, Apprenticeships, Non-Paid Work Experience (NPWE), Work adjustment evaluations.

The case manager must send a completed VAF 28-1905 to the training facility once the IWRP has been completed and signed by the Veteran and the VRC.

b.  Authorization for Training at More than One Facility

(Change Date August 13, 2021)

A Veteran may be authorized to attend training at more than one facility based on the following conditions:

  1. The Veteran is taking a combination course for an OJT and an institutional training.
  2. The Veteran is attending two institutions of higher learning. 

Prior to authorizing a Veteran's school attendance at more than one facility, the case manager must ensure that the primary training facility will accept the courses the Veteran will take at the secondary training facility.

Refer to: M28C.IV.C.2.04.b.2 for developing intermediate objectives for a Veteran who will be attending training at more than one facility.

c.  Authorization for Supplies and Other Services

Payment to a bookstore or service provider may be authorized in IPPS using the related training facility's facility code. However, the VR&E Officer must ensure that a documented agreement exists between the training facility and the bookstore or service provider. Information listed on the training facility website that verifies the agreement, such as a link to the bookstore, is an acceptable form of documentation.

Note: IPPS is not an authorized method for purchasing supplies from an unapproved vendor without a documented agreement with the training facility.

d.  VA cancels an e-Authorization

The case manager must contact and notify the vendor when an e-Authorization is canceled. The case manager must also inform the vendor if a new e-Authorization will be re-issued.

e.  Vendor rejects an e-Authorization

IPPS does not automatically generate a notification to VA when a vendor rejects an authorization. Prior to creating an e-Authorization, the case manager must inform the vendor that the vendor must notify the case manager when he or she rejects an e-Authorization and explain the reason for the rejection.

f.  Facility Codes

All authorizations entered in IPPS or completed using VAF 28-1905 must provide a valid facility or sub-facility code to complete the authorization.

  • A facility code is a unique eight-digit code that identifies facilities approved for payment of education or training under all VA educational benefits, including the Chapter 31 program.
  • A facility code that includes an “X” as the third digit is referred to as a “sub-facility code” (SFC). This represents the location of extension campuses.

When authorizing payments in IPPS for bookstores and related services, such as parking, the training facility's facility or sub-facility code that has an agreement with the bookstore or vendors for related services must be used. 

  • The case manager must access the Web Enabled Approval Management System (WEAMS) to obtain the assigned facility or sub-facility code.
  • Case managers must request access to WEAMS to ensure that the correct facility codes are used when issuing authorizations. Access may be requested by completing and submitting VAF-8824e, Common Security Services (CSS) User Access Request.
  • Under no circumstances should an invalid facility code that is not assigned in WEAMS be used for any authorization.