 1.  Fiduciary Workflow Stage Indicators


Introduction

This topic contains information about fiduciary workflow stage indicators, including

Change Date

November 1, 2021

F.1.a.  Purpose of Development Activities

The purpose of development activities is to control receipt or non-receipt of specific information requested from the fiduciary, beneficiary, or other information provider within an end product (EP). 
Development activities also control for the completion of interviews with the fiduciary, beneficiary, or other individuals.
Administrative tasks should not be created when the receipt of requested information, action, or evidence can be tracked using a development activity associated with an EP.

F.1.b.  Purpose of Claim Level Suspense Reasons

Claim level suspense reasons provide a concise explanation of the pending action taken on a claim within a particular claim status.  Claim level suspense reasons and suspense dates are controlled by pending development activities or actions, claim statuses, or other variables.  Claim level suspense reasons not automatically generated must be properly updated to indicate the pending claim action. 

F.1.c.  Index of Development Activities 

Use the table below to identify the development activities and the corresponding claim level suspense reasons.
Users may add multiple development activities at a time on the EP OVERVIEW screen to track all necessary development while completing work associated with the pending EP.
Generally, when a development activity is added to a Veterans Benefits Management System (VBMS)-Fiduciary EP), the suspense date defaults to 14 days.
Associated EP and Claim Label
Development Activities
Associated Claim Level Suspense
  • 590 Initial Appointment Field Exam
  • 590 Expedited Initial Appointment Field Exam
  • 590 Successor Initial Appointment Field Exam
  • 590 Scheduled Follow-Up Field Exam
  • 590 Telephone Follow-Up Field Exam
  • 590 Unscheduled Follow-Up Field Exam
  • 590 Fund Usage Field Exam
  • 590 Non-Fiduciary Program Field Exam
  • Interview - Beneficiary
  • Interview - Fiduciary
  • Interview Other Individual or Entity
  • Interview Complete - Additional Info Needed
  • Second Attempt - Beneficiary Interview
  • Second Attempt - Fiduciary Interview
  • VA Form 21P-4703
  • VA Form 21P-4718a
  • Bank Statements
  • Miscellaneous Evidence
  • Bank Locate Letter
  • Locate Letter
  • Telephone Development - Beneficiary
  • Telephone Development - Fiduciary
  • Telephone Development - Other Third Party
  • Credit Report Request
  • Credit Report Mitigation Evidence
  • Criminal Background Check Mitigation Evidence
  • Telephone Development - Proposed Fiduciary
  • Properly Titled Account/Direct Deposit Request
  • Bond Request
  • Court documents
In Development
Criminal Background Investigation (CBI)
CBI Required
  • 290 FID-Fund Usage Review
  • 290 FID-Accounting Federal
  • 290 FID-Accounting Court
  • VA Form 21P-4718a
  • Bank Statements
  • Bank Statements Second Request
  • Properly Titled Account/Direct Deposit Request
  • Expense Verification
  • Miscellaneous Evidence
  • VA Form 21P-4706b
  • VA Form 21P-4706c
  • Additional Information Request
  • Bank Locate Letter
  • Bond Verification
  • Credit Report
  • Fee Re-Payment Request
  • Locate Letter
  • Past Due Letter
  • Past Due Letter – Second Request
  • Telephone Development - Beneficiary
  • Telephone Development -Fiduciary
  • Telephone Development - Other Third Party
  • VA Form 21-3537a
In Development
Notes: 
  • Users should only use the Miscellaneous Evidence development activity when the specific development action is unavailable in VBMS-Fiduciary.  When adding the Miscellaneous Evidence development activity, the user must specify the type of evidence being sought.  Avoid the use of local jargon and abbreviations so that the type of information being sought is clear.
  • The fiduciary EP 930s mirror the workflow of its associated fiduciary EP 590 or 290.
References:  For more information on
  • adding development activities, see the VBMS Core User Guide, and
  • updating suspense dates, see M21-4, Appendix F, 1.h.

F.1.d.  Index of Development Activity Fields

Use the table below to identify development activity fields. 
 Field Name
Definition
Claim ID
Unique identifier associated to each EP established in VBMS.
Development Activity
Title of the specific development activity type added by the user.
Status
Reflects whether the development activity is either open or complete.
Actions
Provides options for the user to
  • initiate an action that updates the development activity status from OPEN to COMPLETE, and
  • edit the development activities fields'
  • START DATE
  • DUE DATE, and
  • RECEIVED DATE.
Start Date
The date that the development activity is added to the EP.
Due Date
The next date that the information is due, or follow-up is required.
Close Date
The date that the development activity is indicated by the user as complete.
Received Date
The date that the user indicates that the information or evidence is received.
Date of Contact
The date(s) that the user indicates contact has been completed with a beneficiary, fiduciary, or other party associated with the development activity.
 
Note:  This field is associated with the selection of interview and telephone development actions.
Link
Provides a link to an administrative task associated with the CRIMINAL BACKGROUND INVESTIGATION development activity.

F.1.e.  Index of Claim Level Suspense Reasons 

Use the table below to reference claim level suspense reasons, the controlling element, claim status, and corresponding default suspense date.
 Associated EP
Claim Level Suspense Reasons
Suspense Reason Set By
Claim Status
Claim Level Suspense Date
  •  290 Fiduciary Accounting Court
  • 290 Fiduciary Accounting Federal
Accounting Due
Claim Establishment
Open
30 days
Accounting Received
Development Button
RTW
Development Button Suspense Date Rules
In Development
  • Development Activity
  • Generating the Spanish accounting call letters or accounting past due letters
Open
Development Activity Suspense Date Rules
Pending Concur
Request Accounting Waiver Development Activity
Open
Development Button Suspense Date Rules
Waiver Approved
Development Button
Open
Development Button Suspense Date Rules
Accounting Approved
Development Button
RTW
Development Button Suspense Date Rules
Accounting Disapproved
Development Button
Open
Development Button Suspense Date Rules
  • 590 Initial Appointment Field Exam
  • 590 Expedited Initial Appointment Field Exam
  • 590 Successor Initial Appointment Field Exam
  • 590 Scheduled Follow-Up Field Exam
  • 590 Unscheduled Follow-up Field Exam
  • 590 Fund Usage Field Exam
  • 590 Non-Fiduciary Program Field Exam
Field Exam Assigned
Claim establishment
Open
30 days
In Development
Development Activity
Open
Development Activity Suspense Date Rules
Typing Field Exam Report
Development Button
Open
Development Button Suspense Date Rules
Field Exam Assigned
Development Button
RTW
Development Button Suspense Date Rules
Field Exam Validation
Development Button
RFD
Development Button Suspense Date Rules
Returned by Other User
Development Button
RFD
Development Button Suspense Date Rules
Whereabouts Unknown-1st Attempt
Development Button
Open
Development Button Suspense Date Rules
Whereabouts Unknown-2nd Attempt
Development Button
Open
Development Button Suspense Date Rules
CBI Required
Development Activity
Open
Development Activity Suspense Date Rules
Field Exam Assigned-Dual Jurisdiction
Development Button
RTW
Development Button Suspense Date Rules
Promulgate EP-Generate Award
Development Button
RTW
Development Button Suspense Date Rules
Promulgate EP-Suspend Benefits
Development Button
RTW
Development Button Suspense Date Rules
  • 590 Scheduled Follow-Up Field Exam
  • 590 Unscheduled Follow-up Field Exam
  • 590 Fund Usage Field Exam
  • 590 Non-Fiduciary Program Field Exam
Fiduciary Whereabouts Unknown
Development Button
Open
Development Button Suspense Date Rules
290 Fund Usage Review
Awaiting Bank Statements
  • Development Activity
  • Generating Fund Usage Past Due Letter
Open
Development Button Suspense Date Rules
Pending Review
Development Button
RTW
Development Button Suspense Date Rules
Review Complete
Development Button
RTW
Development Button Suspense Date Rules
Fund Usage Review Rejected
Development Button
RTW
14 Days
In Development
Development Activity
Open
Development Button Suspense Date Rules
290 Misuse
 
Note:  The suspense reasons for all misuse actions are set by the ACTION button or by selecting the appropriate development activity.
Allegation Received
Claim Establishment
Open
30 days
Allegation Pending Concur
Decision to Investigate Memo is Ready For Review
RFD
14 days
Investigation Warranted
Concur with Decision to Investigate Memo
Open
14 days
No Merit
No Investigation Warranted
Closed
N/A
Investigation Assigned
Misuse Investigation Required
Open
14 days
Field Exam Required
Open
14 days
Investigation has Insufficient Evidence
Open
14 days
Investigation Complete
Investigation Complete
RFD
14 days
Determination Pending Concur
Misuse Determination Memo is Ready For Review Development Button
Open
Development Button Suspense Date Rules
Determination Pending Concur HUBMGR
Misuse Determination Memo is Ready For Approval Development Button
RFD
Development Button Suspense Date Rules
Determination Signed
Approve Misuse Determination Memo  Development Button
RFD
Development Button Suspense Date Rules
Misuse Determination Complete
Misuse Found
Open
30 Days
Closed
Misuse Not Found
Closed
N/A
Reconsideration Received
Reconsideration Received
Open
14 days
OIG Referral
Reconsideration Not Received
Open
14 days
Reconsideration Pending Concur
Misuse Reconsideration Determination Memo Ready For Review Development Button
RFD
Development Button Suspense Date Rules
Reconsideration Pending Concur HUBMGR
Review Decision for Misuse Reconsideration Determination Memo Development Button
RFD
Development Button Suspense Date Rules
Reconsideration Pending Concur RODTR
Misuse Reconsideration Determination Ready For Approval Development Button
RFD
Development Button Suspense Date Rules
Reconsideration Signed
Approve Misuse Determination Memo Development Button
RFD
Development Button Suspense Date Rules
Misuse Not Upheld
Closed
N/A
Returned by Other User
Disapprove Misuse Determination Memo Development Button
Open
Development Button Suspense Date Rules
 
Disapprove Misuse Reconsideration Determination Memo
Open
 
Do Not Concur With Decision to Investigate Memo
Open
 
Reconsideration Complete
Misuse Upheld
Open
14 days
OIG Referral
Misuse Reconsideration Determination Memo Should Be Sent For OIG Review
Open
14 days
OIG Hold
OIG Requests For a Hold
Open
14 days
Debt Collection
Debt Memo For SSD
Open
14 days
Debt Collection Admin Task Has Been Created
Closed
N/A
Determination Signed
Approve Misuse Determination Memo Development Activity Button
Open
Development Button Suspense Date Rules

F.1.f.  Index of Fiduciary Claim Statuses 

Use the table below to determine the appropriate fiduciary claim status. 
 Claim Status
Definition
Open
Default status for claims not in any other status. Typically stays in this status during development.
RFD
Signifies that the claim is ready for a fiduciary activity decision.
RTW
Signifies that the claim is ready for a fiduciary activity action.
Closed
The claim is complete with no further action possible.
Cancelled
The claim is cancelled with no further action possible.

F.1.g.  Updating Development Activities

It is the responsibility of all users to ensure that the necessary development activities have been generated.
When acting on an EP, all users are responsible for updating each development activity’s status with the appropriate date(s) and disposition.
Use the table below to determine the appropriate actions to take for updating development activities.
If the evidence or information being sought is ...
Then ...
  • received or obtained, and
  • there is an open development activity
  • the RECEIVED DATE field must contain the date of receipt
  • the DATES OF CONTACT field must contain the dates of contact, if applicable, and
  • the individual development activity must be marked complete.
  • not received or possible after all appropriate requests, and
  • submission timelines have expired
  • the RECEIVED DATE field should be blank, and
  • the development activity must be marked complete.
  • unsolicited, or
  • the appropriate development activity is not of record
  • determine if the evidence or information should be associated to an EP
  • add the appropriate development activity, and
  • update all applicable development activity fields.
Note:  If an EP is necessary and not pending, establish the appropriate EP.
 
References:  For more information on the purpose of
Note:  Ensure all development activities are complete prior to moving the EP to the next stage of the EP workflow unless the EP is being cancelled.
Reference:  For more information on editing, updating and completing development activities, see the VBMS Core User Guide.

F.1.h.  Updating Suspense Dates 

The system may automatically update the suspense reason based on an action by the user within the EP workflow.
It is the responsibility of the fiduciary hub (hub) personnel reviewing or taking action on an EP to ensure that suspense dates
  • are accurate, and
  • reflect the next actionable review date to ensure timely action.
Important:  Suspense dates must always align with existing procedural requirements or predefined system timeframes corresponding to the action.  Suspense dates may not be arbitrarily extended.

 

2.  Fiduciary Administrative Tasks


Introduction

This topic contains information on fiduciary administrative tasks, including

Change Date

September 29, 2021 

F.2.a.  Definition:  Administrative Task 

Administrative tasks are designed to assist hubs in identifying and tracking activities that require follow-up action outside of the processing of an EP.
 
Each administrative task has a descriptive title indicating the nature of the review required.
Important:  Hubs must ensure administrative tasks are processed in a timely fashion, particularly when the tasks are associated with providing oversight and protection of beneficiaries.
The table below describes the two types of administrative tasks.
 Task Category
Description
System-generated
System-generated administrative tasks are created as a result of system triggers such as
  • release of retroactive payments
  • death of the beneficiary
  • automated letter send failure, and
  • claims establishment failures.
Example:  If an EP290 FID Accounting Federal Cest Failure administrative task is assigned to a hub, an accounting audit is due, but the system failed to establish the EP.  This task should be reviewed to ensure timely oversight and establishment of the appropriate EP.  
User-generated
User-generated administrative tasks are established by users to track oversight activities that are not captured as development activities.


F.2.b.  Purpose of Administrative Tasks 

The purpose of manually established administrative tasks is to track work activities that require action when
  • completion of a pending EP is not dependent on resolution of the task-related oversight, or
  • the action cannot resolve without the creation of a task and the establishment of an EP is not appropriate.
For example, an administrative task may be appropriate to track the receipt of certain documentation including, but not limited to
  • a court accounting for a VA appointed fiduciary who is also court appointed when the accounting audit has been approved, or
  • a surety bond adjustment when the accounting or field examination EP can otherwise be resolved.
A manually created administrative task is not appropriate to track the
  • establishment of an EP
  • attempts to locate a missing beneficiary, as available development activities allow users to track these efforts, or
  • remailing of correspondence when an EP is already pending.
Note:  When established, administrative tasks must be properly updated to indicate the accurate stage of processing and the due date.
Reference:  For information on controlling mail received in the centralized mail portal, see FPM, Part II, 1.A.1.f.

F.2.c.  Index of Administrative Task Fields

The table below describes the administrative task fields. 
 Field Name
Description
Title
Distinguishing name of the administrative task.
Priority
Precedence set for the completion of the task.
Type
General category associated with the title of the administrative task.
Days Pending
The number of days that the task has been pending since establishment.
FSR Action
Clarifying action associated with an administrative task.
Station of Jurisdiction
Station associated with completing the task.
Assigned Team
The team to which the task is assigned.
Assigned To
The person to whom the task is assigned.
Date Received
The date that the administrative task is established that corresponds with the date of request for information, unless otherwise prescribed within the FPM.
Due Date
Date the administrative task must be reviewed.
Description
Outlines additional information that further defines the task or purpose.
Action Taken
Describes the actions completed by the task owner.
Important:  Do not edit the TITLE field for system-generated tasks.
Reference:  For more information on creating, editing, and viewing administrative tasks, see the VBMS Core User Guide. 

3.  General Principles of Workload Management


Introduction

This topic contains general principles of workload management, including

Change Date

December 6, 2023 

F.3.a.  Definition of Workload Management

Workload management is a structured and systematic approach used to manage work performed to meet organizational goals.  Workload management controls how claims and other work move through the adjudicative and fiduciary oversight process. 

F.3.b.  Workload Management Resources

Available resources, to include electronic systems and workload reports, must be used to manage and analyze workload, to ensure work is tracked, and completed accurately and timely.
Important:  The effective functioning of these resources relies on adherence to systems compliance guidance by all hub personnel.  Systems compliance is critical, as input deficiencies often result in avoidable rework, and/or hinder the ability to deliver oversight and services in an accurate and timely manner.
Reference:  For more information on sample of workload reports, see M21-4, Appendix F, 4.d.

F.3.c.  Effective Workload Management

Effective workload management controls require
  • inventory control of
    • claims and work items, and
    • administrative tasks
  • effectuating plans to ensure consistent management of hub work activities
  • monitoring progress toward achieving goals, and
  • implementing procedures to identify, analyze, monitor, and take necessary action to address conditions contributing to delays in processing fiduciary activities within the established timelines. 
Important:  Work items include administrative tasks, which are used by hubs as described in M21-4, Appendix F, 2 to track activities that require follow-up tracking outside of the processing of EPs.
Reference:  For more information on inventory control, see M21-4, Appendix F, 3.d.

F.3.d.  Inventory Control

Inventory control of claims, administrative tasks, and work items, with validation, is critical to effective workload management, to include
  • ensuring hub work activities are promptly put under control, developed completely, decided timely, and completed accurately the first time
  • setting accurate suspense/due dates, special issues, flashes, claim labels, and task details (for example, the administrative task title and description align with procedures or the hub’s workload management plan (WMP))
  • properly recording requested and received evidence, and
  • taking appropriate follow-up actions at the earliest possible time.
Note:  Adherence to all systems compliance guidance is mandatory as outlined in procedures and the hub’s WMP.

4.  Fiduciary WMPs 


Introduction


Change Date

December 6, 2023 

 F.4.a.  Definition of WMP

A workload management plan (WMP) is a written operational plan which outlines necessary work processes, assignments of work and the movement of work through all lifecycle phases to completion, including special routing procedures.
 
Note:  Due to workload and staffing variations, no one plan is generally suitable for all hubs.  While Veterans Benefits Administration (VBA) strategic goals and the consistency of user actions on individual fiduciary work actions should not deviate from VBA guidance, the movement of work within hubs may vary.

 F.4.b.  Frequency and Distribution of WMP

Any time there is a change in workload, the WMP must be updated to reflect the change.  The WMP must be reviewed, at a minimum, on a yearly basis and distributed to all employees within the hub 

 F.4.c.  Elements Required in WMP

A WMP must include (but is not limited to) the elements outlined in the table below.
Element
Description
Date of Issuance
The date of issuance, along with date last updated when additional updates are made.
Timeliness Targets and Priorities
Processing timeliness targets and priorities.
 
Examples:  To include but not limited to
  • targets not defined in the Director’s Performance Plan
  • onsite reviews
  • administrative tasks, and
  • work activities that require priority processing. 
Oversight and Assignment of All EPs
Oversight and assignments of all EPs processed by the hub to include 
  • rating
  • non-rating, and
  • work items.
Work Processes and Additional Assignments Not Covered by Standard EPs
Written plans (such as a Standard Operating Procedure) for work processes and additional assignments not specifically covered by standard EPs. 
 
Examples:  To include, but not limited to
  • local mail plan
  • work products that require second and third signatures, and
  • administrative tasks utilization plan. 
Notes:
  • A mail plan must include a description of mail receipt and routing that outlines local procedures from the time mail arrives on station through Public Contact, power of attorneys/Veterans service organizations, private delivery companies, United States Post Office, etc. through shipment to the scanning vendor for upload into Centralized Mail Portal, or other business lines.
  • An administrative task plan must, when not prescribed by procedures, define when it is appropriate for hub employees to establish each type/title of administrative task, applicable description text, and due date.  
List of Workload Reports
List of reports used for oversight of all operational aspects of the hubs.  At a minimum, the list must include 
  • report name
  • source
  • supervisor/employee responsible for generating the report
  • frequency
  • brief description of use, and
  • description of what is considered an outlier.

 F.4.d.  Sample of a Workload Report List

Below is a sample of a workload report list.  This list is not all inclusive.  Hub management must ensure the list encompasses all necessary reports for oversight of all operational aspects of the hub.
 Report
  
Source
Designee
Frequency
Use
Outliers
Homeless Flash Report
Tableau
Homeless Coordinator
Weekly
Monitor and case manage homeless claims listed under the hub’s jurisdiction.
>125 days pending.
Workload Information Tool (WIT)
WIT
Front Office Management
Weekly
Review for accuracy of employee capacity and positions.
Inaccurate reporting of employee position and/or capacity.
WMP
Local WMP
Front Office Management
Quarterly
Monitor compliance with all indicators within the WMP to ensure all necessary work assignments, oversight, validation, and corrective action procedures are in place and make any necessary adjustments to the WMP.
Out of date WMP that does not align with current workload management processes.
Strategic Oversight and Analysis Review (SOAR) Tracker
Local shared drive
Front Office Management
Monthly
Tracking of responsible individuals, submittal, and action items.
Almost due/past due SOARs or action item(s).
Fiduciary Workload Reports
Tableau
Front Office Management
Daily
Monitors the status (for example timeliness, completions) of fiduciary-related actions.
Monitoring timeliness outside of established targets (for example,  days to complete initial appointments including rating, field exam, and finalization of work item cycles listed on the Director’s Performance Dashboard).
Notes:
  • Utilize hyperlinks when applicable.
  • The list can be organized by teams, responsible employee, frequency due, etc.
  • For more efficient updating, one all-inclusive table could be located at the end of the WMP or as a separate document hyperlinked from sections in the WMP, rather than breaking it into shorter lists (for example, in each team section).
  • If kept as a separate document, the list could be updated independently of the WMP; however, a date last updated must be included.   